My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18846
>
2900 - Site Mitigation Program
>
PR0515318
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:05 PM
Creation date
4/1/2020 2:17:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0515318
PE
2965
FACILITY_ID
FA0012087
FACILITY_NAME
FORD CONSTRUCTION CO
STREET_NUMBER
18846
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
01709051
CURRENT_STATUS
01
SITE_LOCATION
18846 N HWY 99
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*000 <br /> MONITORING AND REP&TING PROGRAM NO. 5-01-057 7 <br /> WOODBRIDGE PARTNERS INC. <br /> VICTOR FINE FOODS FACILITY <br /> FOR CLOSURE OF SURFACE IMPOUNDMENTS AND INJECTION WELL <br /> SAN JOAQUIN COUNTY <br /> a. Calculation in accordance with a approved statistical method pursuant to Title 27, Section <br /> 20415; or <br /> b. Calculation by a method acceptable to the Executive Officer in accordance with Title 27 <br /> Section 20415; or <br /> c. The constituent's MDL, in cases where less than 10 percent of the background samples <br /> exceed the constituent's MDL; or <br /> d. A concentration limit greater than background, as approved by the Board for use during or <br /> after corrective action. <br /> 3. Monitoring Points <br /> These WDRs require the discharger to establish an evaluation monitoring system sufficient <br /> to assess the horizontal and vertical extent of polluted groundwater and to design a <br /> corrective action program. Evaluation monitoring will require the installation of additional <br /> groundwater monitoring points in each of the aquifer zones. These WDR also require the <br /> discharger to establish a Vadose Zone Monitoring program. <br /> 4. Points of Compliance <br /> The point of compliance is a vertical surface located at the hydraulically downgradient limit <br /> of the surface impoundments that extends through the uppermost aquifer underlying the <br /> surface impoundment. The discharger shall propose and install groundwater monitoring <br /> points at the point of compliance. <br /> 5. Compliance Period <br /> The Compliance period is the number of years equal to the active life of the surface <br /> impoundments plus the closure period. Each time the Water Quality Protection Standard is <br /> exceeded(i.e., a release is discovered), the surface impoundment begins a Compliance <br /> Period on the date the Board directs the Dischargers to begin an Evaluation Monitoring <br /> Program. If the Discharger's Corrective Action Program (CAP) has not achieved <br /> compliance with the Water Standard by the scheduled end of the Compliance Period,the <br /> Compliance Period is automatically extended until the facility has been in continuous <br /> compliance for at least three consecutive years. <br /> The Dischargers shall implement the above monitoring program on the effective date of this <br /> Order. <br /> Ordered by: <br /> ,('G&Y�PrCARtTON, Executive Officer <br /> 16 March 2001 <br /> (Date) <br /> RDA: <br />
The URL can be used to link to this page
Your browser does not support the video tag.