Laserfiche WebLink
SECOR International Incorporated <br /> HYDROLOGIC DATA SHEET <br /> Gauge Date Project Name ARCO 595, Stockton <br /> Field I echnician t �O ci (i— Project Number 077 43130 050 <br /> roc=Top of Well Casing Elevation DIA=Well Casing Diameter <br /> DTP=Depth to N regi Product(FP or NAPII)Below TOC ELEV=Groundwater Elevation <br /> DTW=Depth to Groundwater Below TOC DUP=Duplicate <br /> DTB=Depth to Bottom of Well Casing Below TOC <br /> WELL OR PURGE & SHEEN <br /> LOCATION TIME MEASUREMENT SAMPLE CONFIRMATION COMMENTS <br /> TOC DTP DTW DTB DIA ELEV (Wlhader) <br /> MW-1 75 4 <br /> MW-2 z 35 65 4 <br /> MW-3 73 4 <br /> MW-4 —417 64 4 <br /> 1 of 2 <br />