My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005750
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2900 - Site Mitigation Program
>
PR0515353
>
ARCHIVED REPORTS_XR0005750
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:33 PM
Creation date
4/1/2020 2:48:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005750
RECORD_ID
PR0515353
PE
2950
FACILITY_ID
FA0012099
FACILITY_NAME
ARCO STATION #595
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B-20-1999 1 20PM FROM P 2 <br /> ENVIRONMENTAL+iEALTH DIVISION <br /> 304 E Weber Ave Thirdi FAw <br /> P.O Box 388,Stockton 201-0388 <br /> Approved De 001, COR <br /> �C kta <br /> 2C 0 d dti p a IrrtersialtUrTulltaCOlpnrGtlecf <br /> Date zo by <br /> _511�VL 'kC%&\Ja1 ltl�:EIVED <br /> �m <br /> August 3, 1999 �-� �4_� A U G 0 4 1999 <br /> Project 077,4182I.001 ENV RONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> Ms Margaret Lagono <br /> San.Joaquin County Environmental Health Department <br /> 304 East Weber Avenue <br /> Stockton, Califbaua 95202 <br /> Re Work Plan for Soil Sampling <br /> during Removal of USTs, Product Lines,and Dispensers <br /> ARCO Service Station#0595 <br /> 6100 North Highway 99 <br /> Stockton, California <br /> Dear Ms Lagorio <br /> On behalf of ARCO Products Company(ARCO), SECOR International Incorporated <br /> (SECOR) will be performing environmental services associated with removal of USTs, <br /> product lines, and dispensers at the above referenced site (Figures 1 and 2) The existing <br /> underground facilities are being upgraded to meet current EPA Standards Construction <br /> activities are anticipated to commence during August and September of 1999 The <br /> purpose of this Work Plan is to notify the San Joaquin County Environmental Health <br /> Department (SJCERD) of the upcoming work and bnefly discuss the sampling <br /> procedures to be followed <br /> SITE BACKGROUND <br /> The site is located at 6100 North Highway 99 in Stockton, California The site is an <br /> operating AM/PM mire-mart and ARCO service station The site currently contains <br /> three 12,000-gallon gasoline USTs and associated product lines and dispensers <br /> PROPOSED SCOPE OF WORK <br /> Facilities at the site are scheduled to be removed by an ARCO-approved contractor <br /> during August and September 1999 Compliance soil samples will be collected per <br /> SJCEHD requirements Field and laboratory procedures are included as Attachment A_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.