My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005752
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2900 - Site Mitigation Program
>
PR0515353
>
ARCHIVED REPORTS_XR0005752
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:33 PM
Creation date
4/1/2020 2:50:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005752
RECORD_ID
PR0515353
PE
2950
FACILITY_ID
FA0012099
FACILITY_NAME
ARCO STATION #595
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y M <br /> Job Safety <br /> JSA Type ®SAR Operations ❑ Transport ❑Office ❑Construction ® New ❑Revised Date 03/30/00 <br /> Co Dept Div Org Unit Loc <br /> Work Type Environmental Work Activity Hollow Stem Auger Sampling <br /> Personal Protective Equtument(PPE) <br /> Minimum PPE is Level D including safety glasses or goggles,hard hat steel-toed and shank boots,hearing protection,and gloves(type dependent <br /> on Job-specific requirements) <br /> Additional PPE may be required in the Health&Safety Plan(HSP) Also refer to the HSP for required traffic control,air momtoring,and <br /> emergency procedures. <br /> Development Team Position/Title Reviewed By Position/Title Date <br /> Field staff must review Job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting <br /> work including, but not limited to, permitting, access agreements, and notification to required contacts (e g site managers, inspectors, clients, <br /> subcontractors, etc) A tailgate safety meeting must be performed and documented at the beginning of each work day Safe Performance Self <br /> Assessment(SPSA)procedures must be used during field activities Weather conditions(heat,cold,rain,lightning)must also be considered <br /> O Job Steps O Potential Hazard ® Critical Actions <br /> Clear drilling locations Traffic hazards,overhead and Reference Borehole Clearance Review form and <br /> underground installations,product coordinate with Station Manger(or designee)to minimize <br /> releases,property damage,dealer potential conflicts Review proposed locations against <br /> inconvenience available construction drawings and known utilities,tanks, <br /> product lines,etc Mark out the proposed borehole <br /> locations Call underground utility locating service for <br /> public line location clearance and get list of utilities being <br /> contacted If necessary,coordinate private line locator for <br /> _privat__proper <br /> Mobilize with proper Vehicle accident Lifting hazards Delay _ Follow safe driving procedures Employ safe lifting <br /> equipment/supplies for drilling or improper performance of work due to procedures Make sure sub-contractors are aware of their <br /> improper equipment onsite responsibilities for labor,equipment and supplies Review <br /> HSP andrmieitt conditions and gather necessary PPE <br /> Visually clear proposed drilling Underground and overhead installations Complete Pre-Mobilization section of Borehole Clearance <br /> locations _ Review form and add dnllmg locations as necessary ___ <br /> Set up necessary traffic control Struck by vehicle during placement Use buddy system for placing traffic control Reference <br /> Vehicle accident as a result of improper traffic control plan section of HSP(may include specific <br /> traffic control a ui ment placement_ requirements based un Permits) ____ <br /> Assist with set up of rig Vehicle accident during ng movement Verify clear pathway to drilling location and clearance for <br /> Damage caused by ng while accessing set- raising mast Provide as-needed hand signals and guidance <br /> up location Contact with overhead to driver to place ng Visually inspect ng(fire <br /> installations Soft terrain Rig movement extinguisher on board,no oil or other fluid leaks,cabling <br /> and associated equipment in good condition,pressurized <br /> hoses secured with whip-checks or adequate substitute, <br /> hacks in good condition9) If necessary,use wooden <br /> blocks underlacks to spread Ioad Chock wheels _ <br /> Set up exclusion zone(s)and work Struck by vehicle during set up Slip/fall Implement exclusion zone set-up instructions of HSP Set <br /> stations(drilling and logging/sample hazards up work stations with clear walking paths to and from ng <br /> collection) <br /> Clear upper five feet of boring using Back strain,exposure to chemical hazards, Don required PPE and initiate air quality monitoring in <br /> post-hole digger or bucket auger hitting an underground utility,repetitive accordance with the HSP Use proper lifting techniques <br /> motion and tools Complete the Pre-Drilling section of the <br /> Borehole Clearance Review form <br /> Contractor <br />
The URL can be used to link to this page
Your browser does not support the video tag.