Laserfiche WebLink
NOT FOR CENTRAL FILES <br /> September 30, 1999 <br /> cMT <br /> YIN DATE MnAL <br /> TO: FRANCIS LAU/Public Facilites 1• <br /> JOHN PULVER/Water Resources/Flood Control 2. 2/l <br /> MANUEL SOLORIO/Design Engineering 3. L!/_ ILJ2.0 i� <br /> TOM HORTON Solid Waste 4. A-) /�/ <br /> WES JOHNSON/Solid Waste 5. NJ—t w:; <br /> GULZAR AULAKH/Bridge Engineering 6. r0 �- <br /> SUKH CHAHAL/Traffic Engineering 7. A) <br /> MIKE McDOWELL/Transportation Planning 8. '_ 47 'Y� <br /> MIKE HUGGINS/Environmental Health 9. <br /> BEN E. NEELY/Real Property 10. <br /> GABRIEL KARAM/Public Services 11. <br /> FROM: BEN E. NEELY/Real Property Division <br /> SUBJECT: STATE HWY 99 WIDENING PROJECT <br /> �O <br /> JAN 'l 8 2000 <br /> TYPE: Supplemental, Preliminary Site PERMIT/SERVICES Study (PSI) ENVIRONMENTAL HEALTH <br /> COMMENT DUE DATE: 1/10/00 <br /> NOTICES OR DOCUMENTS RECEIVED FOR REVIEW: One <br /> TIME IS OF THE ESSENCE. Please indicate yes or no (if you intend to comment or <br /> not), insert the date you handed this memo to the next Division on the list and your <br /> initials on the lines provided above. <br /> INSTRUCTIONS: Please copy the blank Environmental Comment Form on the back <br /> of this memo to record your Division Comment or No Comment on the document <br /> attached. You may hand write, type or electronically transmit your draft comments to <br /> Celeste in Real Property. PLEASE note the page, paragraph and heading of the portion <br /> of the document that your comment applies. THIS IS VITAL TO EXPEDITING <br /> DEPARTMENT COMMENTS TO THE LEAD AGENCY FOR THE PROJECT <br /> PROPONENT. <br /> You will find your final draft comment (as prepared by Celeste Gardea/Real Property <br /> Division) on network drive: //Rp-RPD/Comment.erc/a-open.cmt/H99SUP.018/ *.*, <br /> You should review the final draft comment letter prior to October 18, 1999 (which is <br /> the projected day of transmittal to the Lead Agency). <br /> BEN <br />