My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
6349
>
2900 - Site Mitigation Program
>
PR0505312
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 3:36:37 PM
Creation date
4/1/2020 3:32:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505312
PE
2950
FACILITY_ID
FA0006699
FACILITY_NAME
D V VINEYARDS
STREET_NUMBER
6349
Direction
E
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
6349 E PINE ST 5
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of producing the desired data. The QA officer or the QA officer's desig- <br /> nee will perform one field system audit. <br /> A field procedure audit consists of observing and reviewing procedures <br /> used in the field to ensure that they conform with this SOP. The QA/ <br /> QC Officer or designee will perform a field procedure audit while field <br /> activities related to this SOP are in progress.. <br /> 7.3 NONCONFORMANCES AND CORRECTIVE ACTION <br /> A nonconformance is a deficiency or improper procedure which ren- <br /> ders the quality of an item unacceptable or indeterminate. An example <br /> of a nonconformance related to this SOP might include having an <br /> incorrect sample identification number on a sample label attached to a <br /> liner. An example of a corrective action for this would be to use an <br /> adjacent liner from the same California modified sampler for which <br /> the correct location was known. It is the responsibility of all project <br /> staff to report potential nonconforming items to the Task Leader, Pro- <br /> ject Manager or QA Officer, and it should be included in the field note- <br /> book. <br /> 7-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.