My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
21801
>
2900 - Site Mitigation Program
>
PR0516259
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:48 PM
Creation date
4/1/2020 3:39:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516259
PE
2960
FACILITY_ID
FA0012534
FACILITY_NAME
BARREL TEN QUARTER CIRCLE LAND CO
STREET_NUMBER
21801
Direction
E
STREET_NAME
STATE ROUTE 120
City
ESCALON
Zip
95320
APN
20525002
CURRENT_STATUS
01
SITE_LOCATION
21801 E HWY 120
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy/Jenks Consultants <br /> control, at least two existing monitoring wells will be surveyed and the new and historic <br /> coordinates will be compared and used to assess precision. <br /> 3.2.2 Groundwater Sampling <br /> An initial sampling of groundwater will be conducted from the monitoring well no sooner than <br /> 72 hours after the newly installed monitoring wells have been developed. Groundwater sampling <br /> will be in accordance with the Kennedy/Jenks' SOG for Groundwater Sampling (Appendix D). <br /> Groundwater will be purged from the monitoring wells prior to sampling to obtain samples <br /> representative of aquifer conditions. Field parameters pH, temperature, and electrical <br /> conductivity will be measured and recorded during purging to document stabilization in <br /> accordance with Kennedy/Jenks' SOG for Field Measurement of pH, Temperature and <br /> Conductivity (Appendix E). Purge water from the new wells will be distributed on the ground at <br /> the well site. <br /> Following purging, groundwater samples will be collected into containers provided by a <br /> state-certified laboratory, labeled, kept in a chilled cooler, and delivered to the laboratory under <br /> chain-of-custody procedures. The laboratory will follow their normal turnaround time and internal <br /> quality assurance/quality control (QA/QC) procedures during the analysis. <br /> Samples will be analyzed for the following list of constituents consistent with the existing MRP. <br /> • Alkalinity as CaCO3 (EPA Method 310.1, or equivalent) <br /> • Bicarbonate as CaCO3 (EPA Method 310.1, or equivalent) <br /> • Boron (EPA Method 200.7, or equivalent) <br /> • Calcium (EPA Method 6010, or equivalent) <br /> • Carbonate as CaCO3 (EPA Method 310.1, or equivalent) <br /> • Chloride (EPA Method 300 Series, or equivalent) <br /> • Electrical conductivity (EPA Method 120.1, or equivalent) <br /> • Manganese (EPA Method 200.7, or equivalent) <br /> • Magnesium (EPA Method 200.7, or equivalent) <br /> • Iron (Method 6020A, or equivalent) <br /> • Potassium (EPA Method 200.7, or equivalent) <br /> • pH (EPA Method 9040/9045, or equivalent) <br /> • Sodium (EPA Method 6010, or equivalent) <br /> • Sulfate (EPA Method 300 Series, or equivalent) <br /> • Total dissolved solids (EPA Method 160.1, or equivalent) <br /> • Total Kjeldahl nitrogen (EPA Method 351.4, or equivalent) <br /> 3.2.3 Residuals Management <br /> Residuals generated as a result of these activities are anticipated to include soil cuttings from <br /> the drilling activities, drilling fluid, decontamination water resulting from well drilling activities, <br /> and purge water from the groundwater sampling. The soil cuttings will be contained at each drill <br /> site and then transported to a designated location onsite for distribution. Drilling fluid will be <br /> distributed onto the adjacent LAA. <br /> Monitoring Well Installation Work Plan, Page 5 <br /> Barrel Ten Quarter Circle Land Company, Escalon, California <br /> IISFOIGrou ps11 S-Gro up�AdminW ob1031030118.27_BTQC LC109-ReportslMWd nsta 11-WP lnitext doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.