My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
21801
>
2900 - Site Mitigation Program
>
PR0516259
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:48 PM
Creation date
4/1/2020 3:39:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516259
PE
2960
FACILITY_ID
FA0012534
FACILITY_NAME
BARREL TEN QUARTER CIRCLE LAND CO
STREET_NUMBER
21801
Direction
E
STREET_NAME
STATE ROUTE 120
City
ESCALON
Zip
95320
APN
20525002
CURRENT_STATUS
01
SITE_LOCATION
21801 E HWY 120
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> Kennedy/Jenks Consultants <br /> Table of Contents <br /> List of Tables <br /> List of Figures "' <br /> Listof Appendices...................................................................................................................... in <br /> Section 1: Introduction.................................................................................1 <br /> 1.1 Introduction and Objective ....................................................................1 <br /> 1.2 Facility Overview...................................................................................2 <br /> 1.2.1 Background and Regulatory History..........................................2 <br /> 1.3 Facility Description................................................................................2 <br /> 1.3.1 Historical Facility Operations.....................................................3 <br /> 1.3.2 Historical Process Water Management......................................4 <br /> 1.4 Current Facility Operations ...................................................................5 <br /> 1.5 Land Application Area Site Characteristics............................................6 <br /> 1.6 Regional Setting ...................................................................................7 <br /> 1.6.1 Hydrogeology............................................................................7 <br /> 1.6.2 Soil .................................................................................8 <br /> 1.7 Water Supply........................................................................................9 <br /> 1.7.1 Onsite Groundwater................................................................10 <br /> 1.7.2 Groundwater Elevations..........................................................11 <br /> 1.8 Current Understanding of Groundwater Quality ..................................11 <br /> Section 2: Proposed Groundwater Investigation Tasks.............................13 <br /> 2.1 Task 1 — Research Existing Data and Site Reconnaissance.....................13 <br /> 2.2 Task 2 —Onsite and Off-site Groundwater Sampling ..........................14 <br /> 2.3 Task 3 — Proposed Cone Penetrometer and HydropunchT"" <br /> Groundwater Investigations ................................................................14 <br /> 2.2.1 Upgradient Investigation..........................................................14 <br /> 2.2.2 Downgradient Investigation .....................................................14 <br /> 2.2.3 Onsite Investigation.................................................................15 <br /> 2.4 Task 4— Installation and Development of Monitoring Wells ................15 <br /> 2.3.1 Pre-Field Activities...................................................................15 <br /> 2.3.2 Drilling, Groundwater Monitoring Well Installation and <br /> Well Development...................................................................15 <br /> 2.3.3 Surveying ...............................................................................16 <br /> 2.3.4 Residuals Management...........................................................16 <br /> 2.3.5 Groundwater Sampling............................................................16 <br /> 2.3.6 QA/QC Procedures .................................................................17 <br /> 2.5 Task 5 — Prepare Comprehensive Groundwater <br /> Characterization Report......................................................................18 <br /> Groundwater Investigation Work Plan i <br /> Barrel Ten Quarter Circle Winery, Escalon, California <br /> g:6s-groupladrrinWb1031030118.08_barrelten104reportslgw invest wrk pinitextdoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.