My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
21801
>
2900 - Site Mitigation Program
>
PR0516259
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2026 4:25:00 PM
Creation date
4/1/2020 3:39:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516259
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0012534
FACILITY_NAME
BARREL TEN QUARTER CIRCLE LAND CO
STREET_NUMBER
21801
Direction
E
STREET_NAME
STATE ROUTE 120
City
ESCALON
Zip
95320
APN
20525002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
21801 E STATE ROUTE 120 ESCALON 95320
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy/Jenks Consultants <br /> Water residuals will be distributed on the ground at each work site in a manner that does not <br /> affect work site safety. <br /> 3.3 QA/QC Procedures <br /> Field QA/QC will include collection of one field duplicate groundwater sample of one of the new <br /> wells during the first sampling event. The results of the duplicate sample will be compared to the <br /> primary sample for consistency. The laboratory will follow their standard internal QA/QC <br /> procedures during sample analysis, including elements such as analyzing method blanks and <br /> control spikes where appropriate. <br /> 3.4 Data Review <br /> Analytical data received from the laboratory will be reviewed immediately upon receipt for <br /> completeness and consistency. Discrepancies will be discussed with the laboratory and <br /> corrective measures will be taken. <br /> Monitoring Well Installation Work Plan, Page 6 <br /> Barrel Ten Quarter Circle Land Company, Escalon, California <br /> \\SFMGrou psV S-Grou p WdmMJoM03\030118.27_BTOC LCW9-Reports\MW-Insta1kWP IMtextdoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.