Laserfiche WebLink
Kennedy,,/Jenks Consultants <br /> Section 2: Site Activity Description <br /> Provide additional detail of site activity (attach additional sheets if necessary). <br /> A Monitoring Well Installation Work Plan (Work Plan) was prepared by Kennedy/Jenks <br /> Consultants (Kennedy/Jenks) on behalf of Barrel Ten Quarter Circle Land Company <br /> (BTQCLC) for the Escalon Winery (Winery) located at 21801 Highway 120 Escalon, <br /> California. Two new monitoring wells and one replacement monitoring well will be installed <br /> at the Winery in May 2017. The two new monitoring wells are intended to monitor <br /> groundwater downgradient of proposed new land application areas (LAA). The <br /> replacement monitoring well replaces up-gradient monitoring well MW-6 that has been dry <br /> since 2014. <br /> This HARP is prepared for the field activities associated with the installation of these wells. <br /> Staff should be constantly cognizant of farming equipment, trucks, and other onsite <br /> personnel. <br /> Hazard Appraisal and Recognition Plan Page 2 <br /> ©June 2015 Kennedy/Jenks Consultants <br /> wAoffsvclheallh-saftey\master harp templateldraft master harp templatehnaster harp template june20l5.jbedits.jpj edits(5).wp.doc <br />