Laserfiche WebLink
REQUIREMENTS FOR MONITORING WELL INSTALLATION WORKPLANS AND 3 <br /> MONITORING WELL INSTALLATION REPORTS <br /> - Scaled site map showing all previously existing wells, newly installed wells, <br /> I <br /> surface water bodies, buildings, waste handling facilities, utilities, and other <br /> major physical and man-made features. <br /> B. Drilling Details (in narrative and/or graphic form): j <br /> On-site supervision of drilling and well installation activities <br /> - Drilling contractor and driller's name <br /> Description of drilling equipment and techniques <br /> Equipment decontamination procedures <br /> Soil sampling intervals and logging methods <br /> Well boring log I <br /> a <br /> Well boring number and date drilled j <br /> Borehole diameter and total depth <br /> Total depth of open hole (same as total depth drilled if no caving or back- <br /> grouting occurs) <br /> Depth to first encountered groundwater and stabilized groundwater depth <br /> Detailed description of soils encountered, using the Unified Soil Classification <br /> System <br /> C. Well Construction Details (in narrative and/or graphic form): <br /> Well construction diagram, including: <br /> Monitoring well number and date constructed <br /> Casing and screen material, diameter, and centralizer spacing (if needed) <br /> Length of well casing, and length and position of perforated interval <br /> - Thickness, position and composition of surface seal, sanitary seal, and sand <br /> pack <br /> Type of well caps (bottom cap either screw on or secured with stainless steel <br /> screws) <br /> E. Well Development: <br /> - Date(s) and method of development <br /> - How well development completion was determined <br /> - Volume of water purged from well and method of development water disposal j <br /> f - Field notes from well development should be included in report i <br /> F. Well Survey (survey the top rim of the well casing with the cap removed): <br /> - Identify the coordinate system and datum for survey measurements <br /> 1 - Describe the measuring points (i.e. ground surface, top of casing, etc.) <br /> - Present the well survey report data in a table <br /> - Include the Registered Engineer or Licensed Surveyor's report and field notes in <br /> appendix. <br />