Laserfiche WebLink
Kennedy,/Jenks Consultants <br /> Section 4: Sampling Investigations <br /> Describe samples to be taken and sample source. <br /> An initial sampling of groundwater will be conducted from the monitoring wells no sooner than 72 <br /> hours after the newly installed monitoring wells have been developed. The sampling may be <br /> conducted by other parties. <br /> Groundwater sampling will be in accordance with Kennedy/Jenks' Standard Operating Procedures <br /> (SOG)for Groundwater Sampling (Appendix D of Work Plan). Groundwater will be purged from the <br /> monitoring wells prior to sampling to obtain samples representative of aquifer conditions. Field <br /> parameters will be measured in accordance with Kennedy/Jenks' SOG for Field Measurement of <br /> pH, Temperature, and Conductivity(Appendix E of Work Plan). Following purging, samples will be <br /> collected into containers provided by a state-certified laboratory, labeled, kept in a chilled cooler, <br /> and delivered to the laboratory under chain-of-custody procedures. The samples will be analyzed <br /> for the parameters specified in the Work Plan. <br /> Hazard Appraisal and Recognition Plan Page 4 <br /> ©June 2015 Kennedy/Jenks Consultants <br /> w:loffsvclhealth-safteyVnaster harp templateldraft master harp templatehaster harp template june2015.jhedits.jpj edits(5).wp.doc <br />