Laserfiche WebLink
II <br /> Lisa Medina [EH] <br /> From: Sobieraj,Justin <Justin.Sobieraj@arcadis-US.com> <br /> Sent: Tuesday,June 11, 2013 10:06 AM <br /> To: Lisa Medina [EH] <br /> Cc: Nickens, Amber; Nuel Henderson [EH] <br /> Subject: `RE: 3978 S Hwy 99 Stockton, CA - Status remaining well destructions(309075) <br /> Attachments: Ad Geo - MW-1 Monitoring well install.pdf; MW-4.pdf <br /> Lisa- <br /> I am trying to move the detonation method of abandonment of the two remaining wells(MW-1 and MW-4)at the 3978 <br /> S Hwy 99 Stockton site forward with Chevron: Due to the close proximity of the utilities identified at the wells,we <br /> propose the detonation to occur starting at 10 feet bgs and continuing to TD(giving a good buffer between the <br /> subsurface utilities and the detonation zone). Depth to water has been historically measured at approximately 50 feet <br /> bgs at this site. <br /> Is the plan of detonating from 10 feet bgs to TD acceptable to SJCEHD? <br /> Justin Sobieraj, PG j Project Geologist i justinsobiera4O arcadis-us.com <br /> ARCADUS <br /> ❑ E3132000 Powell Street, 7th Floor i <br /> Emeryville, California 94608 <br /> T:510.596.9684 1 M:415.858.8310 <br /> www.arcadis-us.com <br /> ARCADIS, Imagine the result <br /> Please <br /> +consider the environment before printing this email. <br /> Y AFES 1 a <br /> 1 <br />