Laserfiche WebLink
Client:Chevron Environmental Management pany W@II/BC D:MW-3 <br /> Borehole Depth: 75' <br /> Site Location: <br /> Chevron Serv,ce Station 309075 <br /> 3978 South Highway 99 <br /> Stockton,California <br /> E <br /> `m a <br /> 3 Q3 — cej' E E <br /> Z r n c Well/Boring <br /> Stratigraphic Description Construction <br /> W <br /> W E E . ' A $ <br /> o to N co to <br /> z a c9 <br /> Brown fine to medium SAND(SP),with Gravel,very moist. <br /> 12 55- 4.5 WA WA 1.0 Benonite cement <br /> (1'-60'bgs) <br /> 60 -60 <br /> Hydrated <br /> bentonite seal <br /> (60'-63'bgs) <br /> 13 0-65 N/A WA WA WA <br /> 66 -65 Grades with medium to coarse Sand at 65'bgs. <br /> 14 5.7 5 WA WA 0.0 <br /> 2/12 Sand pack <br /> (63'-75'bgs) <br /> 70 -70 0 2 2"dia.Schedule <br /> • Brown rine to medium SAND(SP),very moist. 40 PVC 0.010" <br /> slotted screen <br /> (65'-75'bgs) <br /> 15 70-75 5 WA WA - <br /> Grades With medium to coarse Sand at 74'bgs. <br /> 0.0J <br /> Bottom of boring 75'bgs. IPI <br /> Remarks: bgs=below ground surface;N/A=Not Applicable/Available;AMSL=Above Mean Sea -- <br /> Level. OD=Outside Diameter;SAA=Same As Above.Odorless unless stated <br /> A��CADIS otherwise. <br /> Northing/Easting Datum is NAD**. <br /> bj/r85t(NCCt38,tsR'hcrur�+1L i�nittes `- <br /> Elevation Datum is NAVD**. <br /> Project Number:B0046012.0001 Template:G:\ENV\CHEVRON\Library\Log Plot\2005 Templates\ age:4 of 4 <br /> Data File:MW-3.dal Date:10/7/2008 V.Rubio <br />