Laserfiche WebLink
March 10, 2003 <br /> NOA Environmental Project Number:LE03-063 <br /> Page 11 <br /> working days from the date of receipt of the samples by the laboratory. Written reports from the <br /> laboratory will follow in as timely a manner as possible. <br /> The technical report will be compiled and published no later than 25 working days after the analytical <br /> procedures are compP leted for ALL soil samples acquired as a result of the implementation of this <br /> p <br /> Workplan. The technical report will be formatted in accordance with California Regional Water <br /> Quality Control Board requirements unless otherwise instructed by the San Joaquin County Public <br /> Health Services, Environmental Health Division <br /> Lr' <br /> VII. SIGNATURES OF ENVIRONMENTAL.PROFESSIONALS <br /> This Soil Contamination Workplan has been prepared by the staff ofNOA Environmental,a division <br /> of Neil O. Anderson& Associates, Inc., and has been reviewed and approved by the professionals <br /> F whose signatures appear below. <br /> The recommendations, specifications, and methodologies .presented herein were prepared and <br /> presented within toe parameters set by the California Regional Water Quality Control Board, in <br /> accordance with generally accepted engineering practices at.the time that this'Workplan was <br /> prepared, and are true and correct to the.best of our knowledge. No other warranty is expressed or <br /> implied. This Workplan was prepared through the use of information and data provided by others. <br /> 1� NOA Environmental in no way warrants the validity-or accuracy of any information provided by these <br /> sources. <br /> } <br /> Prepared by: <br />` Robert A. Nicholson,R.E.A. <br /> Director, Environmental Services <br /> s <br /> Reviewed by: <br /> DG <br /> �P Fo <br /> d' tNF�zQ� <br /> 44/ <br /> David Welch, M.Sc. • No. 6�$4 • <br /> Re istered Geola'`ist No. 6884 <br /> g g 9 <br /> 5 <br /> t <br /> S y <br />