My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5400
>
2900 - Site Mitigation Program
>
PR0522692
>
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 2:38:48 PM
Creation date
4/2/2020 2:21:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1998-2000
RECORD_ID
PR0522692
PE
2957
FACILITY_ID
FA0015465
FACILITY_NAME
FORMER MONTGOMERY WARDS AUTO SRV CTR
STREET_NUMBER
5400
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227008
CURRENT_STATUS
01
SITE_LOCATION
5400 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/29/00 TUE 12:32 FAX 1 91 1 0430 SECOR-SACRAMENTO S U007 <br /> F" =WRTER DeV6 ppM0,jT 916 662 3592 1900.Oe-17 <br /> .�..� _...._�.,...,, 00:44 0729 P.30/34 <br /> - f51 ulu <br /> BID REQUTST SEM-r <br /> R—Ch market si ti <br /> 2359 S.Smm Fa Road-Rirerbeok CA <br /> August IS,2000 <br /> 2M foot Deep Domestic wader Supply Well <br /> Phase 3 Pumps Presm"a Tank,nod Cautrmis <br /> Provide the estimated cast for labor and materials required ro provide 25 gallon per minute <br /> water spice to the main residence on the Pantoj o property. <br /> 2 Pump Installation <br /> 2 Single phase submMible pump,motor,and cable with grourw <br /> 3 1.5' diametm steel drop pipe,Check valve, and gate valve <br /> 4 wX-350 Well.X Rol PtesgL==auk(or equivalent)with pressure gauge. <br /> 5 Tank Pad. (placement of pad will be determine in the field) <br /> 6 Electrical subcontractor charges to tan underground power line to from home to well. <br /> Assume existing electrical panel can be used to power the we <br /> .I,pump. <br /> Please provide your estimated costs for installation of the 25 gpm pumping system. <br /> Also include the estimated cost for it pumping and containment tank capable of delivering 125 gpm. <br /> DO nen include any additional cost& to pump lines to adjoining properties. <br /> EsdnL=d TIM RcTm' ed to Complete Work S Days <br /> TOW Estimated&urs of Rig Time sa Hours <br /> Type of Rig that will be used to colnplere.work / <br /> 2 ]25 aartt weU Costs <br /> Estimated Cost For Mob and Per Diem S ylao S o0 <br /> Estimated Rig Coat o0 <br /> Eatitoated Ma egial cost <br /> Bstimated Labor Costs <br /> Other Costs Not Included <br /> ew r.t - Ceaf +/Cry, pS wr%, a ceA f 11'% <br /> Phase 3 Can Estimates <br /> rte�W�a3�ro-r.i. <br /> p�e a er. <br /> 60/50'd LTat'T£5606 ',IW3 1NNX-MoMa 871iU I TE:bT 0002-ZZ-cno <br />
The URL can be used to link to this page
Your browser does not support the video tag.