Laserfiche WebLink
08/29/00 TUE 12:34 FAX 1 9161 0430 SECOR-SACRAMENTO 40 <br /> la 011 <br /> FROMDeveLOFMEwr 916 662 1592 <br /> 9B-37 eS=aS 97Zg P.Saila <br /> VJ 014 <br /> 13[D REQMT S$EET <br /> Ranch MxW Sire <br /> 23559 S.Sany Pe Road.RivAmr*.CA <br /> August 3S,2000 <br /> 600 foot DMP Domestic Water Supply Well <br /> Phase 3 PuatP,Pressare Tank,and Controls <br /> Provide the estimated Cost for labcr and materials requitt-d to provide 25 gallon per Dllnuoe <br /> water s"vice to the main residence no the panrojo property <br /> 1 Putnp Instaffabon <br /> 2 Single phase submersible pump,motor, and cable with grotmd <br /> 3 1.5"diameter steel dtop Pipe.cheek valve,and gaze valve <br /> 4 X350 Well-X Ttol PrcSsum Tank(or equrvaknt)with pressure gauge, <br /> 5 Tank Pad,(placement of pad wi 11 be determine in the field) <br /> 6 Electrical subcontractor c <br /> Assume harges to run under5mund power line to frolu home w well. <br /> existing electrical panel can be used to Power the.vell pump. <br /> Please provide your estimated costs for installation of the 25 gpm pumping system. <br /> Also include rte estimated cost for a pumping and containment tank capable of delivering 1 <br /> Do not include any additional costs to pump lines to adjoining properties. 25 spm, <br /> Estimated Time Required to Complete Work <br /> Total Estimated Flours of Rig Time S^Days <br /> Type of Rig that will be used to complete work oo Hours <br /> E=Mal <br /> 35— > we11—COats 175 <br /> Od Cast For Mob and Per Diem 3 <br /> Pstimared Rig Cost �/✓A it/�a /.,,,r w�l! <br /> Estimated Material Gbst Sono 5 <br /> Esdtrhated Labor Costs 8aoa <br /> Other Costs Not JnCluded <br /> a — <br /> S <br /> S <br /> Phase 3 Cost tsdenaws S 17 O o p <br /> S <br /> wa�.ort <br /> 60ib0'd LT0bTE6606 'da4J 1N9Wd0'19fHQ 2131141 T£:bT 0002-2Z-'Jflt4 <br />