Laserfiche WebLink
r •M. Infurna Project No. 12 2 <br /> January 20, 2000 <br /> Page 2 <br /> • Disconnecting of the existing vapor extraction and air sparging piping; <br /> • Disassembling the existing well head and removal of the sparging tube; <br /> • Inserting a packer in the wells at a depth of approximately 45 feet below ground <br /> surface; <br /> • Installing a new one-inch pipe threaded into the packer; <br /> • Reassembling the well head using threaded connections instead of slip; and <br /> • Reconnection of vapor extraction and air sparging piping. <br /> Please call me at ext. 240 or Steven Bright at ext. 224 if you have any questions. <br /> ABSU 232\MEMO-DESH22 <br />