Laserfiche WebLink
w. s r i a s fieri wf, n s .- .A -y _, Wiz, <br /> q. <br /> E <br /> during <br /> rilling <br /> Soil cuttings and possibly wells v�ll 'o placed in drumsd and sealed prior to <br /> erial product <br /> sampling of boreholes and <br /> leaving the drilling location. Proper disposal of drummed soil cuttings will be the <br /> responsibility of the client. <br /> Upon completion of sampling, all borings will be backfilled with a mixtu-e of neat <br /> cement grout containing 3 to 5 percent bentonite powder. Ater the cement grout <br /> mixture has settled, boreholes will be capped-off until they are flush with the <br /> ground surface. Borings <br /> cold dribe <br /> lled <br /> The thickness of tbP asphalt in parking areas (through s old patchlwi.11 be <br /> capped with asphaltcoP <br /> similar to that of the original asphalt. <br /> Reno��rtin <br /> Upon completion of the field investigation and receipt of the signed written <br /> analysis from the boratory, a report will be prepared and subling mittede findings and expressing our <br /> recommendations <br />