My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007394
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5400
>
2900 - Site Mitigation Program
>
PR0522692
>
ARCHIVED REPORTS_XR0007394
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 4:33:05 PM
Creation date
4/2/2020 2:49:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007394
RECORD_ID
PR0522692
PE
2957
FACILITY_ID
FA0015465
FACILITY_NAME
FORMER MONTGOMERY WARDS AUTO SRV CTR
STREET_NUMBER
5400
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227008
CURRENT_STATUS
01
SITE_LOCATION
5400 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M Infurna EAI Project No 1232 <br /> April 26, 2001 <br /> Page 2 <br /> • Insert wire-line charges placed as follows <br /> -15 to -40 feet 6 charges <br /> -55 feet 1 charge <br /> -74 to -94 feet 5 charges <br /> -110 feet 1 charge <br /> -121 to -181 feet 13 charges <br /> -200 feet 1 charge <br /> -220 feet 1 charge <br /> -240 feet 1 charge <br /> -260 feet 1 charge <br /> -277 to -297 feet 5 charges <br /> -315 feet 1 charge <br /> For intervals requiring multiple charges, charges will be set at five-foot intervals, <br /> which will destroy the casing rather than just perforate the casing The well will be <br /> tremae grouted from the bottom up and topped off This procedure will be repeated <br /> until the grout level no longer drops <br /> • • Insert tremie pipe from bottom of well to top, and pump nine (9) sack sand and cement <br /> from bottom to five (5) feet bgs <br /> • Remove tremie pipe <br /> • Detonate wire line charges <br /> • Fill up well with grout and mushroom cap to 10 feet bgs <br /> • Backfill excavation with clean fill <br /> • Remove four (4) 5,000-gallon storage tanks (non-petroleum) <br /> • Remove tank supports <br /> • Remove electrical panels <br /> • Cleanup and leveling of gravel mix pad to align with surrounding pad <br /> Please review and let us know if this method is acceptable to the PHS-EHD for destruction of <br /> the RIW <br /> (this space intentionally left blank) <br /> ENVIRONMENTAL AUDIT, INC® <br />
The URL can be used to link to this page
Your browser does not support the video tag.