Laserfiche WebLink
M Hartzell - Project No 1232 <br /> October 18, 2000 <br /> • Page 2 of 4 <br /> Site Address Distance to Well Site feet <br /> Exxon 4404 Pershin&Avenue 3600 <br /> Shell 4445 Pershing Avenue 3600 <br /> 7-11 Store 4501 Pershing Avenue 3400 <br /> EAI reviewed available records maintained by San Joaquin County for these sites Ground <br /> water beneath all of these sites has been impacted and monitoring and remediation wells are <br /> present at all sites Only the Exxon site has free-product on the surface of the ground water <br /> Ground water beneath these sites, when converted to mean sea level data is present at <br /> approximately the same depths as the Wards and Unocal sites The deepest ground water well <br /> installed was 78 feet bgs, for well MW-1 at the Arco site <br /> Since San Joaquin County requirements will preclude slots in the New Irrigation Well at depths <br /> less than 200 feet bgs, including properly sealing the upper zone from pollution, e g, conductor <br /> casing, it is unlikely that the New Irrigation Well will impact any of these sites However, as a <br /> precaution, during pump tests to be conducted for the New Irrigation Well, pressure <br /> transducers/data loggers will be installed in selected wells for the Unocal site located at 4707 <br /> Pacific Avenue, and the Wards site Data from this study will determine if use of the New <br /> Irrigation Well impacts these sites <br /> • 2.0 TEST BORING <br /> Since the existing RIW is slotted at various depths between 40 feet bgs and 322 feet bgs, and <br /> the New Irrigation Well can not be slotted at depths shallower than 200 feet bgs, a test boring is <br /> required to determine the construction details for the New Irrigation Well, in order to ensure <br /> that the same volume of water supplied by the R1W taken out of service, will be supplied by the <br /> New Irrigation Well A test boring six-inches in diameter is proposed to a depth of at least 400 <br /> feet bgs at the proposed location of the New Irrigation Well (see Figure 1) The test boring will <br /> be E-logged and water samples will be collected for analytical testing from potential aquifers <br /> bottom to top These water samples will be selectively analytically tested for chemical <br /> constituents, i e , TPH-G by modified EPA Method 8015 and VOCs including fuel oxygenates <br /> by EPA Method 8260B, and for the following general irrigation parameters, carbonate, <br /> bicarbonate, chloride, sulfate, nitrate, calcium, magnesium, sodium, electrical conductivity, pH <br /> and boron Soil samples also will be collected for sieve analysis <br /> Data obtained nom this activity wili be uses to determine the specitic construction details for <br /> the New Irrigation Well These construction details, along with the San Joaquin County permit <br /> application to install the New irrigation Well, and the proposed pump testing of the well, <br /> including an NPDES permit application for discharge of water from the pump test, will then be <br /> submitted to the RWQCB and San Joaquin County for review and approval <br /> ENV RONMENTAL AUDIT, INC® <br />