Laserfiche WebLink
' Test Boring Results Robinliood Imgation Well Replacement <br /> 1 Claanup and Abatement Order No 5-00-707 EAI Project No 1232 <br /> summarized on Table 1, and Appendix C contains the chain of custody records and laboratory <br /> 1 reports <br /> 3.3 Sieve Analysis <br /> 1 Soil samples from the test boring at various sampling intervals were analyzed for grain size and <br /> grain size distribution using sieve analysts (see Appendix D) Data from this testing were used <br />' to assist in the design of a proposed new irrigation well (see Section 4 0) <br /> 3.4 Ground Water Quality <br /> 1 In order to determine if the quality of the ground water from the test boring was equal to the <br /> quality (general irrigation parameters) of the ground water formerly supplied by the RIW, EAI <br /> 1 requested that SJDC provide information regarding the quality (general irrigation parameters) <br /> of RIW ground water SJ-DC provided EAI with ground water quality data (general irrigation <br /> parameters) from RIW water testing completed in December 1991, t e , reportedly the most <br />' recent data available on water quality (general irrigation parameters) for the RIW (see <br /> Appendix E) <br />' Table 1 compares the water quality for samples collected from the test boring to the RIW For <br /> general irrigation parameters, the water quality for the test boring appears equivalent to that of <br /> the RIW <br /> M <br /> 1 <br /> 1 <br /> i <br /> r <br /> r <br /> SAB 1232TESTSORING <br /> ENVIRONMENTAL AUDIT,INC <br />