My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007901
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5400
>
2900 - Site Mitigation Program
>
PR0522692
>
ARCHIVED REPORTS_XR0007901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 4:44:27 PM
Creation date
4/2/2020 3:34:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007901
RECORD_ID
PR0522692
PE
2957
FACILITY_ID
FA0015465
FACILITY_NAME
FORMER MONTGOMERY WARDS AUTO SRV CTR
STREET_NUMBER
5400
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227008
CURRENT_STATUS
01
SITE_LOCATION
5400 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 16 <br /> SUMMARY OF COST ESTIMATE FOR PUMP AND TREAT <br />' OPTION OF GROUND WATER REMEDIAL ALTERNATIVES <br /> Montgomery Ward, Stockton, California <br />' Page 1 of 1 <br /> TASK NAME TOTAL <br /> TASK 1 Permitting/Health & Safety $ 15,800 00 <br /> TASK 2 Design & Planning $ 19,400 00 <br /> TASK 3 Well Installation (1) $ 16,600 00 <br /> TASK 4 Piping Installation(2) $ 26,300 00 <br /> TASK 5 Equipment Installation& Startup (3) $ 155,830 00 <br /> TASK 6 Operation& Maintenance (2 years) (4) $ 143,200 00 <br /> TASK 7 Reporting (5) $ 23,500 00 <br /> TOTALS $ 400,630 00 <br /> NOTES <br /> 1 - Assumes four additional wells to be installed for pump and treat, also assumes <br /> I using 3 or 4 existing wells for pump and treat <br /> 2 - Does not include piping installation costs for air spargmg or vapor extraction j <br /> system, however, if done concurrently, there could be additional savings <br /> 3 - Assumes air stripper and upgrade VES vapor treatment equipment, capital <br /> costs could be lower for carbon treatment equipment <br /> 4 - Does not include maintenance costs for soil vapor extraction system or costs <br /> for ground water monitoring Costs could be significantly higher if carbon unit <br /> I is used <br /> 5 - Does not include costs for reporting ground water monitoring or vapor extraction <br /> activities <br /> K 11232w971P&TCOST xls <br /> I <br /> Project No 1232 <br />
The URL can be used to link to this page
Your browser does not support the video tag.