My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007901
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5400
>
2900 - Site Mitigation Program
>
PR0522692
>
ARCHIVED REPORTS_XR0007901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 4:44:27 PM
Creation date
4/2/2020 3:34:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007901
RECORD_ID
PR0522692
PE
2957
FACILITY_ID
FA0015465
FACILITY_NAME
FORMER MONTGOMERY WARDS AUTO SRV CTR
STREET_NUMBER
5400
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227008
CURRENT_STATUS
01
SITE_LOCATION
5400 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � � � l♦ I♦ <br /> TA E 20 <br /> GROUND WATER REMEDIAL ALTERNATIVE SCREENING <br /> EVALUATION OF REMEDIAL ALTERNATIVE BY SELECTED CRITERIA <br /> Montgomery Ward,Stockton,California <br /> Page I of I <br /> GROUND WATER REMEDIAL ALTERNATIVES <br /> Number CRITERIA Weights(0-10) Alternative 1 Pump-and-Treat AIternative 2 Air Spargmg <br /> 1 Probability of Achieving Cleanup Goals 10 Probability is very low due to Probability is relatively good based on <br /> contamination m soil pores and offsite results at other sites and pilot test <br /> source <br /> 2 Ease of Implementation 5 Relatively easy to implement since only Very easy to implement since most <br /> piping installation is required components are already installed <br /> 3 Availability of Space 8 Site has sufficient space since only a small Site has sufficient space since only a small <br /> aboveground space is required aboveground space is required <br /> 4 Disruption to Facility Operations 4 This alternative will have very little This alternative will have very little impact <br /> impact to facility operations during to facility operations during installation and <br /> installation and remediation remediation <br /> 5 Time of Completion 7 From experience, a drawback of this This alternative will probably require 2 years <br /> alternative is that this alternative will to complete <br /> probably take a significant amount of time <br /> in achieving cleanup <br /> 6 Cost of Completion 8 The cost to implement this alternative is This aitemative will require approximately <br /> about$400,630,mainly due to equipment $251,440,which is much lower than <br /> and operation costs alternative 1 <br /> 7 Applicabilitv to Soil Remediation 4 This alternative can be combined with This method requires use of soil vapor <br /> vapor extraction to enable remediation of extraction as part of the process <br /> 'dewatered zone' <br /> K 11232W971GRW7 EVAL XLS <br /> I <br /> Project No 1232 <br />
The URL can be used to link to this page
Your browser does not support the video tag.