Laserfiche WebLink
I <br /> STANDARD OPERATING PROCEDURE SOP-9 <br /> GROUND WATER MONITORING WELL SAMPLING <br /> The purpose of this Standard Operating Procedure (SOP) is to provide information on how to <br />' sample a ground water monitoring well Methods explained in this SOP may differ from those <br /> contained in a project specific Work Plan (WP) or Sample Analysis Plan (SAP), and the project <br /> specific WP or SAP should be consulted for modifications to the methods listed below For <br /> purposes of this SOP, it is assumed that a ground water monitoring well has already been installed, <br />' developed and stabilized from development activities, and that a ground level elevation has been <br /> established for the well <br /> IWELL GAUGING <br /> Prior to conducting any purging or sampling activities, depth measurements to fluid levels, e g , <br /> free-product (should any be present) and ground water will be recorded using an interlace probe <br /> accurate to 0 01 foot The measurements will be obtained from a known point located either at the <br /> top of the well casing or well cover Information associated with the sampling will be recorded on <br /> the Environmental Audit, Inc (EAI) Ground Water Sampling Log (copy attached) <br /> FREE-PRODUCT <br /> If free-product is present in the well, no purging activities will be conducted prior to sampling A <br /> sample will be collected that is indicative of the thickness of the free-product within the well This <br /> will be accomplished by the use of a disposable bottom bailer The sample will be sealed in an <br /> appropriate sampling container depending upon the type of product encountered For example, if <br /> the product is gasoline or a similar light end petroleum product, the sample will be sealed in 40- <br /> millimeter <br /> o-millimeter (ml) volatile organic analysis (VOA) vials with Teflon septa lined lids Difterent <br /> containers may be required for other types of product Consult the project specific Work Plan or <br /> Sample Analysis Plan for specifics <br /> GROUND WATER <br /> IPrior to sampling, the well will be purged of three to four welt casing volumes of water using a <br /> down-hole pump or bailer Temperature, conductivity, turbidity and pH readings will be recorded <br /> to evaluate the eftectiveness of purging activities The water sample will be collected from either a <br /> dedicated down-hole pump or disposable bottom bailer Use of this equipment precludes the <br /> potential for cross contamination The sample will be sealed in an appropriate sampling container <br /> depending upon the type of testing to be conducted For example, if volatile organic compound <br /> I testing is required, the sample will be sealed in 40-m1 VOA vials with Teflon septa lined lids The <br /> vials will be completely filled so that no head space exists between the sample and the lids <br /> Different containers may be required depending upon the type of testing to be completed Consult <br /> the project specific WP or SAP for specifics <br />■ <br /> SA8 HA5P SOP9 <br /> Revised February 1994 1 EiVWRONMENTAL AUDIT INC <br />