Laserfiche WebLink
Brian Garber (Page 2) <br /> potential analyses and limited health risk assessment protocol were negotiated with <br /> the local regulatory agency Assessment and TCLP analyses documented that there <br /> was not a potential threat to groundwater, and the site was granted regulatory <br /> closure <br /> Program Manager, Remediation System Operation and Maintenance, Major Oil <br /> Company, Multiple Sites, CA <br /> Responsible for operating and maintaining equipment, system monitoring, <br /> compliance reporting, and optimizing 24 hydrocarbon recovery, and soil and <br /> groundwater treatment systems throughout northern California Technologies <br /> included low-profile and conventional air stripping units, mist bubbler units, carbon <br /> systems, single- and dual-phase vapor extraction systems, and off-gas treatment <br /> using catox, thermox, or retox units The systems are located and permitted through <br /> the jurisdiction of eight different counties, two RWQCBs, four air pollution control <br /> districts, and 12 local municipal POTWs All projects have stayed on budget and <br /> have reduced remediation costs by prorating labor and travel time <br /> Project Manager,Assessment and Remediation of Tanker Truck Spill, Alta <br /> Sierra, CA <br /> Project manager and primary insurance company contact for this $3+ million project <br /> resulting from the accidental spill of 7,000 gallons of unleaded gasoline in a rural <br /> mountain community The majority of the spill traveled through a trailer park <br /> impacting 12 homes and continued into a storm drain that emptied into a wooded <br /> ravine on adjacent property The spill also impacted a fiber optic cable line Soil was <br /> contaminated to depths of more than 50 feet, and at least seven domestic water <br /> wells were impacted Negotiated a reduced fee schedule with emergency response <br /> contractor, and negotiated with numerous home owners and businesses, <br /> homeowners'associations, and local, county, and state officials Project involved <br /> managing client liability by responding to community needs in individual homeowner <br /> and town meetings, excavating and disposing of approximately 15,000 cubic yards <br /> of soil from around the fiber optic cables and private properties, restoring utilities <br /> and properties to pre-accident conditions, and implementing a long-term soil and <br /> groundwater assessment, remediation, and monitoring plan Completed first stage <br /> of excavation and restoration in extremely inclement weather within 90 days <br /> Project Manager, Site Assessment and Remediation, Retail Gasoline Station, <br /> Berkeley, CA <br /> Managing sod and groundwater investigation, forensic product analyses, <br /> groundwater remediation, and redesign of remediation system to dual-phase <br /> extraction system of site where contamination resulted from leaking USTs <br /> Investigation revealed both soil and groundwater impacted with gasoline including <br /> several feet of free product A groundwater extraction and treatment system had <br /> operated at the site for 5 years, treating 3 million gallons of water, and destroying <br /> less than 200 gallons of gasoline In 1994, Fluor Daniel GTI designed, built, and <br /> installed a dual-phase extraction system, which allows the simultaneous removal of <br /> groundwater and vapors at flow rates exceeding 300 scfm Vapors are treated by a <br /> 300 scfm catalytic oxidizer, groundwater is treated by an air stripper with carbon <br /> polish before being discharged to a storm sewer The site is permitted through the <br /> FLUOR DANIEL 67I <br /> Dares wet <br />