<br /> potential analyses and limited health risk assessment protocol were negotiated with
<br /> the local regulatory agency Assessment and TCLP analyses documented that there
<br /> was not a potential threat to groundwater, and the site was granted regulatory
<br /> closure
<br /> Program Manager, Remediation System Operation and Maintenance, Major Oil
<br /> Company, Multiple Sites, CA
<br /> Responsible for operating and maintaining equipment, system monitoring,
<br /> compliance reporting, and optimizing 24 hydrocarbon recovery, and soil and
<br /> groundwater treatment systems throughout northern California Technologies
<br /> included low-profile and conventional air stripping units, mist bubbler units, carbon
<br /> systems, single- and dual-phase vapor extraction systems, and off-gas treatment
<br /> using catox, thermox, or retox units The systems are located and permitted through
<br /> the jurisdiction of eight different counties, two RWQCBs, four air pollution control
<br /> districts, and 12 local municipal POTWs All projects have stayed on budget and
<br /> have reduced remediation costs by prorating labor and travel time
<br /> Project Manager,Assessment and Remediation of Tanker Truck Spill, Alta
<br /> Sierra, CA
<br /> Project manager and primary insurance company contact for this $3+ million project
<br /> resulting from the accidental spill of 7,000 gallons of unleaded gasoline in a rural
<br /> mountain community The majority of the spill traveled through a trailer park
<br /> impacting 12 homes and continued into a storm drain that emptied into a wooded
<br /> ravine on adjacent property The spill also impacted a fiber optic cable line Soil was
<br /> contaminated to depths of more than 50 feet, and at least seven domestic water
<br /> wells were impacted Negotiated a reduced fee schedule with emergency response
<br /> contractor, and negotiated with numerous home owners and businesses,
<br /> homeowners'associations, and local, county, and state officials Project involved
<br /> managing client liability by responding to community needs in individual homeowner
<br /> and town meetings, excavating and disposing of approximately 15,000 cubic yards
<br /> of soil from around the fiber optic cables and private properties, restoring utilities
<br /> and properties to pre-accident conditions, and implementing a long-term soil and
<br /> groundwater assessment, remediation, and monitoring plan Completed first stage
<br /> of excavation and restoration in extremely inclement weather within 90 days
<br /> Project Manager, Site Assessment and Remediation, Retail Gasoline Station,
<br /> Berkeley, CA
<br /> Managing sod and groundwater investigation, forensic product analyses,
<br /> groundwater remediation, and redesign of remediation system to dual-phase
<br /> extraction system of site where contamination resulted from leaking USTs
<br /> Investigation revealed both soil and groundwater impacted with gasoline including
<br /> several feet of free product A groundwater extraction and treatment system had
<br /> operated at the site for 5 years, treating 3 million gallons of water, and destroying
<br /> less than 200 gallons of gasoline In 1994, Fluor Daniel GTI designed, built, and
<br /> installed a dual-phase extraction system, which allows the simultaneous removal of
<br /> groundwater and vapors at flow rates exceeding 300 scfm Vapors are treated by a
<br /> 300 scfm catalytic oxidizer, groundwater is treated by an air stripper with carbon
<br /> polish before being discharged to a storm sewer The site is permitted through the