Laserfiche WebLink
' Mr Mark Gilmartin,Attomey September 24, 1998 <br /> MonEgomery Ward Auto Center,Stockton,CA Page 4 <br /> conditions and appropriate actions that will be taken to avoid cross-contamination between boreholes and <br /> between the various aquifer zones <br /> Suhtask S 2---Well Construction Fluor Daniel GTI will implement traffic control, drilling, soil sampling, <br /> well construction, and well development in accordance with the Work Plan Analytical costs for waste <br /> characterization are included Upon receiving the analytical data, Fluor Daniel GTI will recommend to you <br /> and your client the most cost-effective way to dispose of the derived wastes Upon request, Fluor Daniel <br /> G TI will provide costs and assist Montgomery Ward in disposing of these wastes Soil samples will be <br /> submitted to a State-certified laboratory for analysis using standard turnaround time <br /> Suhtasti 5 3—Well Survey Following installation, the fluor Daniel GTI will use a State-licensed surveyor <br /> to locate well boxes and top of casings (foi water level measurements)relative to California State Plane <br /> Coordinates and Mean Sea Level The survey will be conducted on existing and newly installed <br /> remediation and monitoring wells <br /> Cost Savings Another potential cost reduction would be for Fluor Daniel GTI to conduct a post-bid site <br /> visit for the well installation subcontractors and ask them to re-submit their estimates based on the site <br /> information We have competitively bid this task, but believe the subcontractors' costs could be reduced if <br /> they were more familiar with the site <br /> Task 6 Trenehirig and Piping Installation <br /> Pin <br /> Based on the Design Drawings provided in Figure 13 of the CAP, it is estimated that approximately 580 <br /> linear feet of trench will be excavated for the installation of the piping/conduit Fluor Daniel GTI assumes <br /> that no trench plates will be required and that no delays will be incurred due to site operations <br /> Fluor Daniel GTI will supervise a subcontractor who will perform the trenching, piping, pressure testing, <br /> backfilling, compaction, and compaction testing The pressure testing of all piping will be conducted on a <br /> section by section basis Pressure testing will consist of isolating the various pipe sections and applying 50 <br /> pounds per square inch (psi)of pressure for a period of at least six hours <br /> Trenches shall be excavated to 2 feet bgs for piping placement Where suitable, excavated material may be <br /> used as backfill material in the trenches At l% feet bgs conduit warning ribbon will be buried before <br /> completing trench backfill and compacting to finished elevation <br /> The trenches will be completed as follows, giving precedence to City of Stockton directives or permit <br /> requirements <br /> ■ Place and compact suitable backfill material in 12-inch lifts <br /> ■ Remove slough, compact subgrade (as necessary), and fill material to a minimum of 95% relative <br /> density to within the top 6 inches of final subgrade The top 6 inches of subgrade shall be <br /> compacted to a minimum of 95%relative density <br /> ■ Use backfill placement methods that do not disturb or damage existing utilities or structures <br /> a Compact backfill placed within 3 feet of existing structure foundation using light mechanical <br /> compaction equipment <br /> MGWCAP5[7 WPD <br /> FLUOR DANIEL GTI <br /> 4 <br />