Laserfiche WebLink
Kennedy/Jenks Consultants <br /> 3.3.3 Groundwater Sampling <br /> An initial sampling of groundwater will be conducted from the two monitoring wells no sooner <br /> than 72 hours after the newly installed wells have been developed. Groundwater sampling will <br /> be performed in accordance with the SOG for Groundwater Sampling found in the SAP <br /> (Appendix C). Groundwater will be purged from the monitoring wells prior to sampling to acquire <br /> samples representative of aquifer conditions. Field parameters pH, temperature, and specific <br /> conductance will be monitored during purging to document stabilization. The parameters will be <br /> •- measured in accordance with Kennedy/Jenks' SOG for Field Measurement of pH, Temperature, <br /> and Specific Conductance found in the SAP (Appendix C). Field parameters will be recorded on <br /> the Groundwater Purge and Sample Form (a copy of the form is provided in the SAP). The <br /> groundwater level will be measured according to Kennedy/Jenks' SOG for Measuring <br /> Groundwater Levels also found in the SAP. <br /> The groundwater samples will be collected using a disposable bailer or using a positive <br /> _ displacement pump. One duplicate sample will be collected during each sampling event, in <br /> accordance with Appendix C. Purge water will be distributed on the ground or in the LAA at the <br /> _ Facility. <br /> Following collection, groundwater samples will be labeled, packed in appropriate containers, <br /> and forwarded to a state-certified laboratory under a completed chain-of-custody record in <br /> accordance with Kennedy/Jenks' SOG for Sample Packaging and Shipping found in the SAP. <br /> The laboratory will follow their normal turn-around time and internal quality assurance/quality <br /> control (QA/QC) procedures during the analysis. <br /> Samples will be analyzed for: <br /> Nitrate as nitrogen (EPA Method 300 Series) <br /> Total Kjeldahl nitrogen (EPA Method 351.4) <br /> Chloride (EPA Method 300 Series) <br /> • Sulfate (EPA Method 300 Series) <br /> • Electrical conductivity (EPA Method 120.1) <br /> • pH (EPA Method 150.1) <br /> Iron (EPA Method 200.7) <br /> • Manganese (EPA Method 200.7) <br /> • Sodium (EPA Method 200.7) <br /> Potassium (EPA Method 200.7) <br /> • Magnesium (EPA Method 200.7) <br /> • Total dissolved solids (EPA Method 160.1) <br /> • Biochemical oxygen demand (EPA Method 405.1) <br /> _ The sample and analysis methods, preservatives, and holding times for the analyses are <br /> presented in Table 8. <br /> Groundwater monitoring of the two new monitoring wells will then be incorporated into the <br /> existing MRP. <br /> Groundwater Protection Work Plan, The Wine Group Page 3-5 <br /> Franzia Winery, Ripon, California <br />