Laserfiche WebLink
TABLE 1 <br /> Project Task Scheduling and Assignments <br /> .. .. ... ..................... <br /> . ..... ....... <br /> ....... ..... .................:................ .............. <br /> ....... ... <br /> .. ............. <br /> . ...................... ...................... ....... <br /> ................................... ....... . ..... <br /> .3 . .... <br /> ................................... ........... ..... <br /> ... ....... <br /> ............ .......... ... <br /> ............ .............. ... ... <br /> ............ <br /> ........... ..... <br /> I. DEMOLITION FIELD PREPARATIONS <br /> 1 Site Health and Safety plan preparation. Sierra-Pacific <br /> 2 Underground Services Alert Survey. Griffith <br /> 3 Identification of demolition items. Cargill <br /> 4 Identification and marking of waste and debris All <br /> collection and storage areas. <br /> 5 Construction meeting. All <br /> 6 Pressure washing of tanks and lines (aboveground and Cargill & Griffith <br /> underground). <br /> 7 Collection and re-use of diluted feed products. Cargill & Griffith <br /> 8 Lock-out/Tag-out of all power sources. Cargill <br /> 9 Isolate and close storm water and waste water drains. Griffith <br /> 10 Asbestos survey of buildings (Upon Cargill's Request). Sierra-Pacific <br /> 11 Obtain demolition permits. Griffith <br /> U. ASBESTOS REMOVAL AND DISPOSAL <br /> 12 Removal and disposal of asbestos containing materials Sierra-Pacific <br /> from buildings. <br /> III. BUILDING DEMOLITION & DEBRIS DISPOSAL <br /> 13 Verify utility shut-down. Griffith <br /> 14 Demolish identified buildings. Griffith <br /> 15 Dispose of debris at a Class III landfill. Griffith <br /> IV. DEMOLITION OF TANKS/PIPING & SCRAP DISPOSAL <br /> 1 Interior Tank Testing (Only ammonia related products). Griffith <br /> 17 Pipe dismantling. Griffith <br /> Sierra-Pacific Groundwater Consultants, Inc. <br />