Laserfiche WebLink
u I%d <br /> -----Original Message----- <br /> From: Gayleen Perreira [mailto:GPerreira@waterboards.ca.govI <br /> Sent: Thursday, July 16, 2009 11:45 AM <br /> To: Steve Gittings <br /> Cc: Jeff Willett; Mark Madison; John Kramer <br /> Subject: Re: Installation of Background Groundwater Monitoring Well <br /> Hi Steve, <br /> Finished the Study, and I think it's great. A couple things: 1) Is <br /> there a well-abandonment procedure somewhere in the report so that I <br /> can also provide approval for closure of well MW-4 in my letter, and <br /> FYI 2) we agree with the study's work plan; however, an evaluation of <br /> the data results and characterization of the site gradient and flow is <br /> needed before any determinations by our staff on the "present-day <br /> background concept" can be made as appropriate in this case. <br /> Gayleen <br /> Gayleen Perreira, P.E. <br /> Water Resource Control Engineer <br /> Permit Section, NPDES Unit <br /> Central valley Regional Water Quality Control Board 11020 Sun Center <br /> Drive #200 Rancho Cordova, CA 95670 <br /> Phone: (916) 464-4824 <br /> email: gperreira@waterboards.ca.gov <br /> >>> "Steve Gittings" <Steve.Gittings@ci.stockton.ca.us> 7/10/2009 3 :43 <br /> PM >>> <br /> Hi Gayleen, <br /> No we are not tolerating you, we very much appreciate all the help you <br /> have provided in giving us a fair and scientifically justifiable <br /> permit. <br /> In regards to having the submitted Work Plan and Time Scheduled review <br /> by your staff could you provide some written concurrence fromyour <br /> office that we can proceed with the work as described in the work plan <br /> in order to obtain well closure and construction permits from San <br /> Joaquin County. Could you please provide a statement via letter or <br /> email that your office allows closure of well MW-4 and groundwater <br /> sampling and well construction described in the Work Plan. our work <br /> plan submitted March 11 included the Time Schedule (Table 7) , which <br /> showed the Grab Sampling starting May 1, 2009 and the beginning of the <br /> Study as July 1, 60 days later. (The formal commencement of the study <br /> is proposed to begin 60 days after commencement of the field work in <br /> order to use the full 2 .5 years allowed in the permit to collect <br /> independent <br /> samples. ) We request that the formal commencement of the study be <br /> postponed until 60 days after we have received your directive to start <br /> the well installation. Pending receipt of your email or letter, we are <br /> prepared to begin according to the schedule in a revised Table 7, <br /> attached. <br />