Laserfiche WebLink
LEGEND <br /> SVP-5A/B <br /> e GRAB SOIL GAS SAMPLE <br /> ® SOIL GAS PROBE EX-2 <br /> X SOIL GAS EXTRACTION WASHER SVP-2A/B ® X <br /> WELL <br /> ---- EXISTING SEWER LINE DRY CLEANING ' <br /> is _____ ® SVP-4A/B MACHINE i LS <br /> a PERFORATED VENT PIPE SEE DETAILS <br /> 1 AND 2 ON <br /> AI <br /> v <br /> SOLID CONVEYANCE PIPE I - X EXE i FIGURE 3 <br /> _"-- -- <br /> U "-""" PERFORATED VENT PIPE(3) SEE DETAIL4 <br /> __ _ _ —____ __ ON FIGURE 3 <br /> SEE NOTE 2. SV-3 <br /> I � <br /> SVP-tA/B ® e EX-1 <br /> a <br /> 3 I I <br /> ` I <br /> � I 3 <br /> 1100 FIG. I <br /> a I I <br /> Z <br /> 3 <br /> 0 SEWER CAP SVP-3A/B <br /> 3 SV-1 - - - - - - <br /> 9 N <br /> N <br /> N <br /> SEE DETAILS 5 AND <br /> ON FIGURE 4 <br /> TO ROOF e <br /> N <br /> c SV-2 <br /> a NOTES: <br /> z 1.LOCATIONS OF PROPOSED FEATURES ARE <br /> c APPROXIMATE AND MAY BE ADJUSTED 0' 2' <br /> DURING INSTALLATION WITH APPROVAL FROM <br /> THE ENGINEER. Approximate Scale in Feet <br /> a 2.PROPOSED PIPING TO CROSS OVER <br /> ,a. EXISTING SEWER LINE.DEPTH AND LOCATION CLIENT: <br /> N OF THE EXISTING LINE TO BE POSITIVELY SAFETY FIRST RobinhoodPlazaLLC Sub-Slab Venting <br /> , <br /> J IDENTIFIED PRIOR TO EXCAVATION IF ANY System <br /> a <br /> POWERED HEQUIPMENT <br /> WNINPUWILL BE USED. �� r�� �cQ PROJECT: Y Layout <br /> a 3.PIPING SHOWN IN PURPLE WILL BE DRIVEN 1 J l.. <br /> p � C&5 One Hour Martinizing <br /> DIRECTLY BENEATH SLAB BY HAND, <br /> e n g l n e e r i IT g PROJECT NUMBER: <br /> Figure 3 <br /> 0146.001.002 <br />