Laserfiche WebLink
W GIR, <br /> • souithwest, IIne. <br /> Phase II as having high levels of contaminants. Other areas of particular concern are those <br /> where investigation was prohibited due to the presence of debris stockpiles and other <br /> obstructions. Should stockpiles be removed that precluded sampling during this Phase II <br /> ESA, it is recommended that these areas be sampled. <br /> Additional research should be conducted into conditions on the adjacent ST Services Terminal <br /> site in order to ascertain whether an offsite source may be affecting groundwater quality in <br /> this area. The most current data on the status of the August 2007 PCB release on the site <br /> should be obtained and evaluated with respect to the soil and potential groundwater PCB <br /> contamination identified in this investigation. <br /> The preceding recommendations are based on the data generated by this Phase II investigation <br /> which has confirmed the presence of contamination due to the historical and ongoing <br /> operations of The Leamer Company. <br /> • <br /> 704. PRIM 34 July 21, 2008 <br />