My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
12001
>
2900 - Site Mitigation Program
>
PR0528241
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:05 PM
Creation date
4/3/2020 2:14:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0528241
PE
2965
FACILITY_ID
FA0019099
FACILITY_NAME
DELICATO FAMILY VINEYARDS
STREET_NUMBER
12001
Direction
S
STREET_NAME
STATE ROUTE 99
City
MANTECA
Zip
95336
APN
20405014,23,24
CURRENT_STATUS
01
SITE_LOCATION
12001 S HWY 99
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
When you pdf the permits to the driller can you also cc Tom and Cindy, email below. <br /> From: Butler, Thomas (Walnut Creek) rmailto:Thomas.Butler(dstantec.com] <br /> Sent: Monday, May 12, 2014 3:07 PM <br /> To: Adrienne Ellsaesser [EH] <br /> Cc: Christine Campbell (Christine.Campbell(sbdelicato.com) <br /> Subject: Delicato Workplan Approval and and MRP <br /> Importance: High <br /> Adrienne, per our discussion today, please find attached the approval letter from the regional board for the <br /> new wells MW-7 and MW-8. These wells are being installed to monitor land application of process water <br /> pursuant to the facilities waste discharge requirements, issued by the Regional Board. The monitoring and <br /> reporting program is also attached and per your request shows the sampling program required by the state for <br /> groundwater on Page 5. Also attached is the location of the two proposed monitoring wells (MW-7 and MW-8). <br /> Both wells will be approximately 50 feet deep,2-inch PVC. The sanitary seal will extend to a minimum depth of <br /> 20 feet below ground surface. Let me know if you have any further questions. Thanks! <br /> -tom <br /> Thomas W. Butler II, PG, CHG, CEG <br /> Senior Hydrogeologist/Geochemist <br /> Stantec <br /> Phone: (925) 296-2126 <br /> Fax: (925) 296-2105 <br /> Thomas.Butler@stantec.com <br /> II <br /> The content of this email is the confidential property of Stantec and should not be copied,modified,retransmitted,or used for any purpose except with <br /> Slantec's written authorization.If you are not the intended recipient,please delete all copies and notify us immediately. <br /> Q Please consider the environment before printing this email. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.