Laserfiche WebLink
ATTACHMENT D D-2 <br /> ORDER R5-2013-0028 <br /> DELICATO VINEYARDS, INC. <br /> SAN JOAQUIN COUNTY <br /> D. Well Development (not to be performed until at least 48 hours after sanitary seal <br /> placement): <br /> Method of development to be used (i.e., surge, bail, pump, etc.) <br /> Parameters to be monitored during development and record keeping technique <br /> Method of determining when development is complete <br /> Disposal of development water <br /> E. Well Survey (precision of vertical survey data shall be at least 0.01 foot): <br /> Identify the Licensed Land Surveyor or Civil Engineer that will perform the survey <br /> Datum for survey measurements <br /> List well features to be surveyed (i.e. top of casing, horizontal and vertical <br /> coordinates, etc.) <br /> F. Schedule for Completion of Work <br /> G. Appendix: Groundwater Sampling and Analysis Plan (SAP) <br /> The Groundwater SAP shall be included as an appendix to the workplan, and shall be <br /> utilized as a guidance document that is referred to by individuals responsible for <br /> conducting groundwater monitoring and sampling activities. <br /> Provide a detailed written description of standard operating procedures for the <br /> following: <br /> - Equipment to be used during sampling <br /> - Equipment decontamination procedures <br /> - Water level measurement procedures <br /> - Well purging (include a discussion of procedures to follow if three casing volumes <br /> cannot be purged) <br /> - Monitoring and record keeping during water level measurement and well purging <br /> (include copies of record keeping logs to be used) <br /> - Purge water disposal <br /> - Analytical methods and required reporting limits <br /> - Sample containers and preservatives <br /> - Sampling <br /> o General sampling techniques <br /> o Record keeping during sampling (include copies of record keeping logs to be <br /> used) <br /> • QA/QC samples <br /> - Chain of Custody <br /> - Sample handling and transport <br />