My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
12001
>
2900 - Site Mitigation Program
>
PR0528241
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:15 PM
Creation date
4/3/2020 2:15:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528241
PE
2965
FACILITY_ID
FA0019099
FACILITY_NAME
DELICATO FAMILY VINEYARDS
STREET_NUMBER
12001
Direction
S
STREET_NAME
STATE ROUTE 99
City
MANTECA
Zip
95336
APN
20405014,23,24
CURRENT_STATUS
01
SITE_LOCATION
12001 S HWY 99
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KennedyJenks Consultants <br /> SOG 1: Standard Operating Guideline <br /> Boring and Subsurface Soil Sampling <br /> 1.1 Introduction <br /> This guideline describes the equipment and procedures that are used by Kennedy/Jenks <br /> Consultants personnel for drilling and collecting soil samples. <br /> 1.2 Equipment <br /> • Drill rigs and associated drilling and sampling equipment as specified in work plan: <br /> • Hollow stem auger <br /> • CME, 5 ft x 94 mm continuous-core barrels (hollow-stem auger) <br /> • 2.5-inch or 2.0-inch I.D. split-spoon drive sampler <br /> • 2.5-inch or 2.0-inch brass liners and sealing materials (plastic end caps, Teflon seals, silicon <br /> tape, zip-lock plastic bags) <br /> • Large capacity stainless steel borehole bailer <br /> • Sampler cleaning equipment <br /> • Steamcleaner <br /> • Generator <br /> • Stiff-bristle brushes <br /> • Buckets <br /> • High purity phosphate-free liquid soap, such as Liquinox <br /> • Potable water <br /> • Insulated sample storage and shipping containers <br /> • Personal protective equipment (refer to project site safety plan) <br /> 1.3 Typical Procedure <br /> 1. Obtain applicable drilling and well construction permits prior to mobilization. <br /> 2. Clear drilling locations for underground utilities and structures by Underground Service Alert <br /> (USA) and subcontractors. <br /> 3. Have all downhole equipment steamcleaned prior to drilling each boring. <br /> 4. Ensure that borings made to construct shallow monitoring wells are drilled with an auger drill rig <br /> that uses hollow stem augers of appropriate size to provide an annular space of a minimum of <br /> 2 inches between borehole wall and well casing. <br /> 5. Verify that drill borings used to construct deeper monitoring wells are drilled with a dual tube <br /> percussion hammer or air-rotary casing hammer, using a steel drive casing of appropriate size, <br /> or with hollow stem augers through a steel conductor casing. <br /> Monitoring Well Installation Work Plan SOG 1 <br /> Delicato Family Vineyards, Manteca, California <br /> g.k-gmpta in�'obWA076500100D_ b'ca1o1094W$Y msla#w pin pppndtalI subsurhotlsamp.0 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.