Laserfiche WebLink
• Kennedy/Jenks Consultants <br /> I <br /> A.2 Sample OAIAC <br /> Field QA/QC will include collection of one field duplicate sample during each groundwater sampling <br /> event. The results of the duplicate sample will be compared to the primary sample for consistency. <br /> The laboratory will follow their standard internal QA/QC procedures during sample analysis, <br /> including elements such as analyzing method blanks and control spikes where appropriate. <br /> A.3 Standard Operating Procedures i <br /> The following sections outline the standard operating procedures for field activities during <br /> groundwater sampling activities (attached): <br /> SOG 1: Boring and Subsurface Soil Sampling <br /> SOG 2: Borehole Logging and Example Copy of Boring and Well Construction Logs <br /> (Forms F-40.1 and F 40.2) <br /> • SOG 3: Well Construction and Development and Example of Well Completion Report <br /> (Form F 42) <br /> • SOG 4: Groundwater Sampling and Example of Groundwater Purge and Sample Form <br /> (Forms F-43.1 and F 43.2) <br /> SOG 5: Field Measurement of pH, Temperature, and Conductivity <br /> SOG 6: Measuring Groundwater Levels <br /> • SOG 7: Sample Packaging and Shipping and Example Copy of Chain-of-Custody Record <br /> • SOG 8: Equipment Decontamination <br /> i <br /> Monitoring Well Installation Work Plan A-2 <br /> Delicato Family Vineyards, Manteca, California <br /> gtiSVO.pWmMyohIW10765001.00_delks(M-pts�Mslenw pMWppendix Nepµe sep.oec <br />