Laserfiche WebLink
3 <br /> Reporting and Schedule . <br /> After completion of the field work,and laboratory analyses,the:data will be evaluated <br /> and assembled into a report. Included in the report will be soil analytical results, chain- <br /> of-custody documentation,.a* summary of field observations`, assessment, and <br /> conclusions. This report will be submitted to the SJCEHD within 6 to 8 weeks of <br /> receiving analytical sample results from the_laboratory. - - <br /> If there are any questions,regarding the contents of this Work plan addendum,please call <br /> us at(916) 858-2350. <br /> Sincerely, <br /> ` •.r - -.. •Y RciY\.Pil�vii Vu1 drltal iJ ro l Itc: •. - - .z• ,. .. } <br /> � <br /> Tim Anenson 1 ��ED Geo W. 9,Q <br />• - Senior Project Engineer' • � Q o� J,� . <br /> FCrr <br /> 4556 z o <br /> Chris.Brown <br /> 0 <br /> Senior Geologist F of CA��F <br />' RG 4556 € <br /> cc: Mr.-'.Brett Hunter, Chevron Products Company <br /> Ms. Elizabeth Thayer, RWQCB Central Valley Region <br /> Mr.'Wilbur.Smith II, Sims-Grupe Management <br /> Mr. Donald Bradshaw,-Levine-Fricke-Recon <br />