Laserfiche WebLink
i-� <br />} <br /> e. <br /> I <br /> �dr <br /> ° - Former5tation Building <br /> Lur <br /> n Former r <br /> Dispenser Q <br /> _ Wand V <br /> r <br /> raw-3 0 <br /> ----------- ; Forme <br /> f <br /> / ----------' tank <br /> Basin f <br /> / Former <br /> Dispenser ' <br /> / Islamds t <br /> Mw1 ----`---- Mw-7 <br /> / <br /> MW-4� << <br /> HAMMER LANE " <br /> NOTES Site Sketch After <br /> Vapor Recovery Layout <br /> By Exxon Company <br /> wti <br /> LEGEND Date: 10/31/75 <br /> Monitoring Well <br /> Well Location From Site Plan <br /> By Environmental Services ' <br /> Praposed Soil Boring Date: 10/30/92 0 30 <br /> 60 � <br /> Approximate Scaie <br /> All locations Are Approximate _ <br /> 1,.-30' �a <br /> PROPOSED SOIL BORING LOCATE FIGURE <br /> DRAWNBY" <br /> Ed Bernard DATE:March z 1,993 :. <br /> REWSEDEY: DATE. Exxon Service Station IFAS#7-1050 ` <br /> J. Paradis April 27,1993 :r <br /> 909 Hammer Lane PROJECT NUMerk ° <br /> REVIEWED BY: DAZE: Blackfan,GA <br /> 10-93005 ' <br /> �eh�l3 <br />