Laserfiche WebLink
Project: Ripon Farm &.,vice Project No.: Ate,-NC-95-0137 BORING NO.: <br /> Site Address: 28871 South Highway 99 Total Depth: 35.0 NM5 <br /> Ripon, California Date: 14 August 1995 (B11) <br /> Drilling Co.: Mitchell Drilling Environmental Logged by: Little Page I of I <br /> Rig/Auger Type: CME-75HT/8"Hollow Stem Reviewed by: Ong <br /> ... ....... <br /> ............. <br /> N�4��� ��� 04���'��G�� 0 <br /> gr.....m.. <br /> V <br /> a 6. <br /> SC <br /> MW5-5 0.0 15/22/31 Brown,moist,claey,fine-grained sand;no hydrocarbon odor. <br /> 10— MW5_10 0.0 20/15/30 Light Brown,dry,claey,fine-grained sand,no HC odor. <br /> MW5-15 0.0 25/30/35 Light Brown,dry,claey fine-gained sand,no HC odor. <br /> Black,moist,claey,fine-grainded sand, strong HC odor. <br /> 20— MW5-20 0.6 29/29/30 Light Gray,moist,claey,fine-grained sand,HC Odor- <br /> SM <br /> MW5-25 0.0 26/26/30 Light Brown, with gray mottling, wet, silty, fine-grained sand, <br /> no HC odor. <br /> 30-- MW5-30 1.0 20/27/29 Light Brown, with gray mottling, wet, silty, fine-grained sand, <br /> no HC odor. <br /> MW5-35 NIS <br /> 40— Total Depth-35 feet <br /> Water encountered at 25 feet <br /> Boring completed as ground water monitoring well MW-5. <br /> Advanced one <br /> GeoEnvironmental, Inc. <br /> A:%%RFSMW5.SAM 09/28195 0 4:06 PM <br />