Laserfiche WebLink
Vicki McCartney [EH] <br /> From: Vicki McCartney[EH] <br /> Sent: Monday, May 05, 2003 1:23 PM <br /> To: 'wlittle@advgeoenv.com' <br /> Subject: Site at 22502 S. Highway 99 in Ripon <br /> Bill, <br /> was hoping to receive the site conceptual model (SCM)and work plan last Friday, May 2, 2003, for the site called Jimco <br /> Truck Plaza at 22502 South Highway 99 in Ripon. This information was requested in a letter from the Environmental <br /> Health Department sent on March 23, 2003. The SCM and work plan are needed to address the recent increases of <br /> gasoline, diesel, and MTBE, and help define the vertical and horizontal extents of contamination at this site. <br /> Please let me know if the passive skimmers have been installed in MW-1 and MW-6 to remove the free product. EHD <br /> requested that these skimmers be installed in both monitoring wells in the directive letter dated March 23, 2003. <br /> Also,why were groundwater samples not collected at monitoring well, MW-9, during the September 2002 and January <br /> 2003 sampling events? <br /> Please call or respond to this e-mail and let me know the status of the SCM, work plan, passive skimmer installations, and <br /> sampling at MW-9, at your earliest convenience. <br /> Thank you, Bill. <br /> Vicki McCartney <br /> 304 E. Weber Avenue <br /> Stockton, CA 95202-2708 <br /> Phone(209) 468-3456 <br /> Fax (209) 468-3433 <br /> vmccartney@sjcehd.com <br /> 1 <br />