Laserfiche WebLink
Page l of 1 <br /> Vicki McCartney [EH] <br /> From: Scheele,'Ron [rscheele@cambria-env.com] <br /> Sent: Monday, April 18, 2005 3:39 PM <br /> To: wlittle@advgeoenv.com <br /> Cc: Vicki McCartney [EH] <br /> Subject: Ripon survey data <br /> Bill, I forgot one thing: Could you please send me the well elevation survey for the Ripon Farm service site. We <br /> recently had the wells resurveyed at the Jimco Truck Plaza and well elevations changed by —1.72 ft in all the <br /> wells. I would like to check that both sites are using the same elevation benchmark prior to using any of the joint <br /> monitoring data. <br /> Thx <br /> Ron <br /> -----Original Message----- <br /> From: Scheele, Ron [mailto:rscheele@cambria-env.com] <br /> Sent: Monday, April 18, 2005 2:20 PM <br /> To: 'wlittle@advgeoenv.com' <br /> Cc: vmccartney@sjcehd.com <br /> Subject: coordinated monitoring event - 2nd Qtr. <br /> Bill, <br /> Cambria would like tosetup a date to perform a coordinated monitoring event in the second quarter for the Jimco <br /> Truck Plaza and Ripon Farm Service sites. It looks like the gw sampling schedule has varied in the past, but we <br /> would like to arrange a day during the beginning of the"B" month. Any day the week of May 2 through 6th would <br /> work for us, except for May 3rd <br /> Please let me know asap if one of the proposed days is acceptable. <br /> Regards, <br /> Ron <br /> Ron Scheele, R.G. <br /> Senior Project Manager <br /> Cambria Environmental Technology Inc. <br /> 5900 Hollis Street, Suite A <br /> Emeryville,; California 94608 <br /> (510) 420-3327 ph <br /> (510) 420-9170 fax <br /> www.cambria-env.com <br /> f 4/18/2005 <br />