My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1022
>
2900 - Site Mitigation Program
>
PR0534875
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:40:37 PM
Creation date
4/7/2020 1:26:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0534875
PE
2960
FACILITY_ID
FA0020170
FACILITY_NAME
AAA TRUCK WASH/JIMCO TRUCK PLAZA
STREET_NUMBER
1022
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102004
CURRENT_STATUS
01
SITE_LOCATION
1022 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
View images
View plain text
.Daily Tailgate Meeting <br /> Site: Start Date: <br /> Completion Date: <br /> ❑ Site Plan with JSAs and MSDSs <br /> ❑ Possible hazards and known contaminants on-site <br /> ❑ PPE required (Hard hat, Gloves, Safety Glasses, Coveralls, Steel Toed <br /> Boots) <br /> ❑ Identify and communicate emergency routes <br /> ❑ Locate the nearest hospital. <br /> ❑ Locate the fire extinguisher <br /> ❑ Locate the emergency shut-off switch (at active service stations) <br /> ❑ Everyone signs the Site Safety Plan <br /> Scope of Work <br /> ❑ Number of wells/borings—(clear to 8 feet) <br /> ❑ Sampling interval <br /> ❑ Identify any traffic and/or pedestrian hazards <br /> ❑ Identify the site constraints (i.e any difficulties that may be <br /> encountered during drilling; near dispensers; lithology) <br /> ❑ Identify overhead and subsurface hazards, <br /> ❑ Establish safety perimeter around equipment and work zone <br /> ❑ Proper lifting of equipment used to transport heavy objects (i.e. drums, <br /> augers) <br /> ❑ Stockpile and/or drum location <br /> ❑ Check kill switch on rigs and inspect all equipment <br /> Communicate time constraints (i.e. if you must be off street/sidewalk <br /> at certain time) <br /> ❑ Communicate time of grout inspection. <br /> ❑ Ensure there are observation cards (LPO, SPSA) available/on-site <br /> No dirt or slurry is allowed in storm drains <br /> ❑ Have Stop Work Authority <br /> ❑ Leave the site clean! <br /> Comments and Site Specific Issues: <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).