Laserfiche WebLink
.._............_.._.......... <br /> Visually clear proposed drilling Underground and overhead Complete Pre-Mobilization section of Borehole Clearance Review <br /> locations utilities/obstructions. form and adjust drilling locations as necessary. <br /> Set up any necessary traffic Accident during placement or as a result of Use buddy system for placing traffic control. Reference traffic <br /> control. improper traffic control equipment control plan section of SSP(may include specific requirements <br /> placement. based on erinits). <br /> Assist with set up of drill rig. Damage caused by drill rig while Make sure driller ensures clear pathway to drilling location and <br /> accessing set-up location. clearance for raising mast. Provide as-needed hand signals and <br /> guidance to driver to place rig. Visually inspect rig(fire <br /> extinguisher on board,no oil or other fluid leaks,cabling and <br /> associated equipment in good condition,pressurized hoses secured <br /> with whip-checks or adequate substitute,jacks in good condition?). <br /> ---- - --- - _.... ....... ..._......_ .... ........ _..... _ ..........---$ ... ......_......_...__...._... <br /> Set up exclusion zone(s)and Injury or exposure to public or other onsite Implement exclusion zone set-up instructions of SSP. Set up work <br /> work stations(drilling and personnel. Slip/fall hazards. stations with clear walking paths to and from rig, <br /> logging/sample collection)_ <br /> ...._....._........ . ..... ....... ...... ......................... _.._...._.. .-- ..__... ---...__....._....._----- <br /> Clear upper five feet of Back strain,exposure to chemical hazards, Don any additional PPE and initiate air quality monitoring in <br /> borehole. hitting an underground utility accordance with the SSP. Use proper lifting techniques and tools. <br /> Clear boring to full diameter and to 5 ft depth.Complete the Pre- <br /> Drilling section of the Borehole Clearance Review form. <br /> _ ... ....... ........_.......................... ....... ......................_ .... --- - <br /> Perform SPSA. Changes in anticipated subsurface Reconcile air monitoring results with current PPE and SSP <br /> conditions.Consider worst case scenario. guidance. <br /> ......_._............._....__.._.__._._........__............_..... .—_.._........__._..__._._................_._....._-......_......_..............__.._.....__......_..........._...._._.._.._...........__......._..._. _. - <br /> Commence drilling borehole. Cross-contamination from previous hole. Decontaminate sampling equipment after collecting a sample and <br /> back strain,heat or cold,eye injury, decontaminate drilling augers/rods after drilling a borehole.Use <br /> exposure to chemical hazards,hitting an proper lifting techniques. Use PPE and monitoring in accordance <br /> underground utility, trip and fall, with SSP. Monitor drilling. Keep work area clear of tripping or <br /> catastrophic equipment failure,clothing slipping hazards. Perform periodic visual inspections of drill rig.. <br /> becoming entangled with the drilling Do not wear loose fitting clothes that can become entangled with <br /> equipment. the drilling equipment. Do not put your body near drilling <br /> ......___.............__._equipment while the equipment_is mo__in ----- ^— <br /> Collect samples in accordance Cross-contamination,improper labeling or Decontaminate sampling equipment between each sampling run. <br /> with sampling plan. storage. Label samples in accordance with sampling plan. Keep samples <br /> stored in proper containers,at correct temperature,and away from <br /> work area. <br /> _..._._.............._.................._....................._._.........._........................._....................._.................................._._........._......_....................._.._.................__._..._..................._.........._...........__...-.._........_......._................................_................_._........-.........._......._....-_-._........................-...--.........---..__..._....._......--- ............ <br /> Store cuttings properly in Exposure to public. Traffic hazard or Have proper storage containment and labeling available onsite. <br /> accordance with site-specific obstruction/inconvenience to station Place materials in isolated location away from traffic and other site <br /> re uirements. operation. Improper storage or disposal. functions. Coordinate proper disposal offsite(where applicable). <br /> 9._.........._. p . ................... <br /> Construct well. Back strain,eye injury,trip hazard. Cross- Use proper lifting techniques and PPE. Keep pathways from well <br /> contamination. Non-approved supplies to borehole clear of tripping hazards. Confirm <br /> construction. construction with project manager. Make sure casing and other <br /> materials are clean before going into borehole. Ensure presence or <br /> other authorization by any required inspectors for well <br /> i n s tal l ati on/g .rou t i..n......g. <br /> _......- --- . __-_.._...........____.- <br /> ---................._........-._._.._._..-- -._......._._._.-._........_...............-.............._.... ._.. <br /> —..__... _.._..._...._.._....I----..........._.................._...._.....----.......... ........_....... .. ... ... --- ---_� <br /> Install well vault. Back strain,eye injury,trip hazard, Use proper lifting technique and equipment to install well vault. <br /> particulate inhalation. Non-approved well Wear proper PPE(including steel-toed boots and eye protection). <br /> box installation. Complete well vault smooth to grade to eliminate trip hazard (if <br /> slightly elevated to prevent storm water intrusion,make sure to <br /> slope concrete skirt smoothly and gradually). <br /> .._....-._....-------....._.............._._._.......-...--.... ..._.-.._......_._.....-._.._..._......._..........__..............._...._...__.._...._._._._.....---.._.....__.........._.........._.....-......._..............................._......- ...........---....._.._.._.._........_._.............. - .....- <br /> Develop well Physical injury from mechanical failure. Make sure equipment is in good working order. Wear PPE in <br /> Trip hazard.Exposure to contaminants. accordance with SSP. Keep work area orderly.Decontaminate all <br /> Cross-contamination. equipment going into well. <br /> —_. . . <br /> Dispose or store purge water Back strain. Exposure to contaminants. If Use proper equipment to transport water(pumps,drum dollies, <br /> onsite disposing through onsite treatment system, etc.). Wear PPE in accordance with SSP. Review any instructions <br /> damage or injury from improper use of for use of onsite treatment systems. Label storage containers <br /> equipment. Improper storage or disposal. properly and locate in isolated area away from traffic and other site <br /> functions. Coordinate offsite disposal(where applicable). <br /> _.... ....... . ......._.......... ._.......... ._. <br /> Clean site/demobilize Traffic. Nuisance or safety hazard left on Use buddy system as necessary to remove traffic control. Leave <br /> site. site clean of refuse and debris. Clearly mark/barricade any well <br /> heads that need later work or concrete curing.Notify station <br /> personnel of departure,Map well locations,site structures,and <br /> location of drilling wastes. <br /> i:\admin\safety\jsa forms\jsa-monitoring well installation.doc <br /> j �E� ��� 1 1 1 1 1^��1��� c�1lt• _ f- 17iz.�ft�iTwTtF�Ti1. <br /> F:\SAFETY\Safety and Health Manual (SHM)\SHM App A-LPS Forms\.ISA forms\JSA Boring-Well Installation.doc <br />