Laserfiche WebLink
" G <br /> I <br /> ZS March 2003 <br /> AGE-NC Project No 98-0433 VY <br /> f� ,S <br />' Page 5 of 5j <br />' • Installation of a passive skimmer in well MW-6 to recover free-product, as proposed In the <br /> AGE-prepared Free-Phase Petroleum Remediation Work Plan, dated 18 February 2003 <br />' • Preparation of a work plan for installation of additional monitoring wells to determine the ' <br /> source of free-product in monitoring well MW-6 <br /> r i � <br /> Coordinate the ground water monitoring activities of Jimco Truck Plaza and,the adjacent <br />' Ripon Farm Service (22871 South Highway 99) to occur concurrently <br />' 6.0 LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br />' conditions at the site for the purpose of this Investigation were made from a limited number of <br /> available data points (I e ground water samples), and subsurface conditions may vary away from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> tinterpretations, opinions and recommendations contained in this report <br /> i <br /> 1 <br /> • <br /> 1 <br /> Advanced GeoEnvironmental,Inc <br /> 1 Y <br />