Laserfiche WebLink
1 - <br />' Quarterly Report - Third Quarter 2004 <br /> JIMCO TRUCK PLAZA <br />' 22502 South Highway 99, Ripon, California <br />' 1.0. INTRODUCTION <br /> At the request of Mr Dan Koch of Olympian Oil Company, Advanced GeoEnvironmental, Inc <br />' (AGE)has prepared this quarterly report for the Jlmco Truck Plaza,located at 22502 South Highway <br /> 99,Ripon,California(the site) The scope of work included quarterly ground water monitoring and <br />' preparation of this report The location of the site and the immediately surrounding area are <br /> illustrated on Figure 1 The site structures, boring and monitoring well locations are illustrated on <br /> Figure 2 <br />' This report has been prepared in accordance with guidelines established by the Central Valley <br /> Regional Water Quality Control Board (CVRWQCB) for the subsurface investigation of <br />' underground storage tank (UST) sites Background information, including details of previous site <br /> assessment work, was presented in AGE's report titled Preliminary Investigation and Evaluation <br /> Report (PIER), dated 13 December 1999 <br /> 2.0 PROCEDURES <br /> lie Field work was conducted in accordance with guidelines established by the CVRWQCB for the <br /> investigation of UST sites and the San Joaquin County Environmental Health Department (EHD) <br />' for sampling of ground water monitoring wells <br />' 2 1 WELL MONITORING AND PURGING <br /> On 22 July 2004, a Solinst water level meter was used to measure the depth to ground water from <br />' the well casing tops in wells MW-1 through MW-9 The depths to ground water are summarized in <br /> Table 1 <br />' After water levels were gauged, disposable plastic bailers were used to purge the monitoring wells <br /> of a minimum ofthree casing-water volumes(approximately 0 6 to 15 gallons)of ground water The <br />' purged water temperature,pH, and conductivity were measured at regular purge intervals using an <br /> Oakton Water Analyzer,the field data sheets are included in Appendix A Purged water was stored <br /> on-site in 55-gallon drums <br /> 0 <br /> Advanced GeoEnvironmental,Inc <br />