Laserfiche WebLink
ms <br /> All work for this project was performed under the responsible charge of a Registered Geolagst Our <br /> prol`es't.ionaV services,were provided u..stng That degree of..are and'sktll ordinarily exercised by <br /> environmental consultants practicing:in this or sittiilar localities The findings;weremsin ly based upon <br /> analytieal results provided by an independent laboratory. Evaluations of the liydrogeologtcal condtttons . <br /> at the site for the purpose of this investigation are made from a limited number of available data <br /> points (i.e. monitoring wells), and subsurface conditions m :wiry away froin:'these data pattats The' <br /> information contained in this report has received appropriate technical':review and spproval 'This <br /> acknowledgement is trade in,lieu of all'warranties, either exptpssed or implied: <br /> Project: MONITORING WELL INSTALLATION AND QUARTERLY REPORT <br /> Rond Property <br /> 7001 Rond Road <br /> Lodi, California <br /> Performed by: Geological Audit Services, Inc. <br /> 1803 West March Lane, Suite A <br /> Stockton, California 95207 <br /> Field Activities Conducted by: <br /> Kevin Mckibben Date c t Tipton Date <br /> Staff Geologist Vnvironmental Technician <br /> Report Prepared by: <br /> /Z-20 4-7 <br /> Bob Marty Date <br /> Project Manager <br /> Reviewed and Approved by: -1 <br /> \S,��RED Grp <br /> �y B. Cy C� <br /> No.3475 <br /> Victor B. Cherven Date <br /> Principal Geologist <br /> Registered Geologist #3475 q <br /> L <br />