My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:26:58 PM
Creation date
4/7/2020 2:23:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
705
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. Section 4.2, Activities and Schedule for Site Completion, Page 27: The Report states <br /> that "The systems are expected to continue operation until 2013 or until ACLS are <br /> attained, if earlier than 2013." This statement implies that, even if ACLS are not attained <br /> by 2013, the operation of the groundwater extraction and treatment systems will be <br /> discontinued. For clarity,please indicate that groundwater remediation will continue <br /> (even beyond 2013) until ACLS are attained. <br /> 11. Section 6.0, Five-Year Review, Page 28: The Report states that the first five-year review <br /> will be completed in 2003. However, based on the 2000 U.S. EPA Guidance "Close Out <br /> Procedures for National Priorities List Sites", the Report should specify what type of <br /> Five-Year Review should be performed (i.e., a statutory or a policy review). For clarity, <br /> please indicate whether a statutory or a policy review will be performed after five years. <br /> 12. Table 8, Cost Estimates for Remedial Actions, Page 29: The table indicates that the <br /> construction contract and Operation and Maintenance (O&M) expenditures for the <br /> Pesticide Mix Area were estimated to be $120,000. However, since soils in the Pesticide <br /> Mix Area with concentrations exceeding Final Remediation Goals (FRGS)have already <br /> been excavated and disposed, it is unclear why the construction contract and O&M <br /> expenditures can only be estimated. For completeness, please include the final costs for <br /> the construction contract and O&M activities for the Pesticide Mix Area in the table. <br /> Alternatively, explain why the cost was estimated. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.