DDJC-Sharpe Post ROD Documentation <br /> FFA Schedule <br /> Draft <br /> ------ <br /> Document Submission Review Submission Review Submission <br /> Document Title Status Date Period Date Period Date Comment <br /> Firsl Quarter Well Monitoring Report Secondary 30 April each 30 days 30 May each Ongoing <br /> year year <br /> Second Quarter Well Monitoring Secondary 30 July each 30 days 29 August Ongoing <br /> Report year each year <br /> Fourth Quarter Well Monitoring Secondary 30 January 30 days 1 March each Ongoing <br /> Report each year year <br /> FFA Annual Progress Report Primary 60th day of the 60 days 60th day 30 days Following Ongoing. Note the annual reporting period is <br /> following following review period 4Q of previous year through 3Q of current <br /> calendar year receipt of year. <br /> comments <br /> DNAPL Investigation Technical Secondary 26-Oct-98 30 days 21-Dec-98 30 days 20-Jan-99 In preparation. <br /> Memorandum <br /> OU-2 SVE System Optimization Secondary R2 12-Feb-99 30 days R2 10-May-99 30 days R2 10-Jun-99 In preparation. <br /> ' I„r Work Plan <br /> OU-2 Site 29133 Metals Investigation Secondary R 26-Feb-99 30 days R 7-May-99 30 days R 7-Jun-99 In preparation. <br /> Yl` Technical Memorandum <br /> Water Management Report Secondary 26-Feb-99 60 days 26-May-99 30 days 25-Jun-99 Will include a tentative schedule to implement <br /> report recommendations to enhance plume <br /> capture and optimize system operation. In <br /> contracted scope,outline approved,modeling <br /> is underway. <br /> Operations and Maintenance Manual Secondary TBD 30 days TBD 30 days TBD Primarily addressing OU-1 systems,but will <br /> -installation wide operating systems. address on-going OU-2 systems as needed. <br /> Requires contract action. <br /> Interim OU-1 Groundwater Remedial Primary 27-Sep-99 60 days 24-Jan-00 30 days 23-Feb-00 Is prepared when OU-1 GW treatment <br /> Action Report system is operating in a manner to achieve <br /> cleanup levels. Requires contract action. <br /> OU-2 Technical Report titled"Draft Secondary 19-May-98 60 days Review completed.The follow-on document <br /> Interim Close Out Report'-NFA --- -- to this draft is the draft OU-2 RAR-NFA <br /> sites sites. <br /> OU-2 Remedial Action Report-NFA Primary R3 24-Aug-99 60 days R3 15-Dec-99 30 days R3 21-Jan-00 The draft"Interim Close Out Report'should <br /> sites be considered a pre-draft version of this <br /> document. <br /> OU-2 Remedial Action Report- Primary 8-Mar-99 60 days 2-Jul-99 30 days 1-Aug-99 Requires contract action. <br /> Metals removal sites <br /> OU-2 Remedial Action Report-SVE Primary 24-Jan-00 60 days 28-Apr-00 30 days 28-May-00 The schedule for this report is dependent on <br /> sites completion of the SVE field effort. Requires <br /> contract action. <br /> Draft final documents will be submitted with a"final”cover and title page. 4i2r99 <br /> '• If no comments are received by the end of the draft final review period,the document will be considered final. shrpFFAsched4.:1: <br />