My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:26:58 PM
Creation date
4/7/2020 2:23:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
705
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
URS 0 0 <br /> October 18, 2004 OCT 2 1 2004 <br /> ENVIRONMENT HEALTH <br /> Harlin Knoll PERMIT/SERVICES <br /> San Joaquin County Public Health Services <br /> Environmental Health Department <br /> 304 E. Weber Avenue, Third Floor <br /> Stockton, CA 95202 <br /> SUBJECT: Groundwater Monitoring Well Installation, Sharpe Army Depot,Lathrop, CA <br /> Dear Mr. Knoll: <br /> On behalf of the Defense Logistics Agency,DDJC-Sharpe/Tracy Environmental Management,URS <br /> will be drilling and constructing two additional groundwater monitoring well clusters as part of the <br /> on-going remediation effort at the Sharpe Army Depot. The wells to be installed are in the North <br /> Balloon area within the Sharpe Depot. These wells have already been approved by the RWQCB <br /> (Marcus Pierce). <br /> Drilling is scheduled to begin on November 1, 2004. Sarah Tourre of URS is the field coordinator, <br /> and Hollis Phillips of the URS San Francisco office will be the field geologist. We will keep you <br /> informed of any schedule changes and progress. Sarah's office phone number is 916-679-2367, and <br /> Hollis's field cell phone number is 415-269-7056. Gregg Drilling will again be responsible for the <br /> drilling and well installation. <br /> Attached to this letter are a well location map and a table of well specifications. <br /> Please contact me at(916)679-2267 with any questions or concerns. <br /> Sincerely, <br /> Dick Van Dyke <br /> Project Manager <br /> c: Mike Thomas,URS <br /> Sarah Tourre,URS <br /> Project File <br /> URS Group, Inc. <br /> Crown Corporate Center <br /> 2870 Gateway Oaks Drive,Suite 300 <br /> Sacramento,CA 95833 <br /> Tel:916.679.2000 <br /> Fax:916.679.2900 <br />
The URL can be used to link to this page
Your browser does not support the video tag.