My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1988-1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
SITE INFORMATION AND CORRESPONDENCE_1988-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:14:45 PM
Creation date
4/7/2020 2:36:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1988-1991
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TE*o . 4 9 , 91 15 : 03 No . J11 F . 02 <br /> h <br /> FACILITY: Defense Distribution Region West, Sharpe Site <br /> LOCATION: Lathrop <br /> CONSULTANT: U. S. Army Toxic and Hazardous Materials Agency (USATHAMA) <br /> Environmental Science and Engineering (ESE) <br /> PROPOSAL DATE: Vapor Extraction Pilot Study Work Plan <br /> 28 Jurie 1991 <br /> Monitoring Well(s) (Vapor) <br /> Soil Boring(s) <br /> i' Soil Excavation S <br /> — ( ) DepthVery shallow (approx. 3-4 ft. for double <br /> X 8Vapor extraction wells ringed infiltrom ter tests) <br /> We have reviewed the above proposal concerning the above check items and the <br /> Proposal is acceptable. <br /> Date: Staff Signature: Geiy <br /> The proposal has been discussed with USATHAMA, A detailed review of the Vapor <br /> Extraction Work Plan will follow under a separate cover letter. <br /> Five feet of bentonite pellets in the au <br /> lus 's unacceptable. The bentonite <br /> must be hydrated prior to placement in . annulus or clean, contaminant free <br /> water must be added to the pellets of placement in the annulus. Five feet <br /> of bentonite is unnecessary and shoul be reduced to two or three feet, if <br /> bentonite pellets are to be used. <br /> Twenty soil borings are not approved as these were not discussed in the Work <br /> Plan. Specifics on the purpose and locations of the borings were not discusse . <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.